Wind Power,Wind Turbine Manufacturer

Wind turbines employ three rotor blades that feed into generators

Wind turbines employ three rotor blades that feed into generators to create electricity. The pitch of these blades can be adjusted on the fly to respond to current conditions and to optimize power output. That variability creates opportunity for wind turbines to maximize the elements to create clean energy, but this changeability also creates waste, since the energy storage systems frequently used are sized to meet the highest possible power demands, even if those rates only occur briefly and sporadically.

When wind turbines generator employ batteries to store energy for emergency power supply, several issues emerge:

Batteries struggle under moments of high peak power.
Batteries perform poorly in low temperatures.
The operating life of a battery is extremely limited in extreme conditions.
Frequent replacement of batteries creates potentially dangerous situations for engineers and maintenance crews.
Batteries do a poor job of delivering the frequent, short power boosts small wind turbines need to make rapid rotor blade adjustments and create electricity.

Hummer 400w wind-solar hybrid wind generator for park

1. Hummer H1.25-400w wind-solar hybrid power system is an innovative ,environmentaly source .

2. It is cost effective and simple to install .

3. H1.25-400w wind-solar hybrid power  system is a new concept in amenity  lighting designed  for the 21st Century providing illumination at almost any  location remote from  the grid  electricity supply.

4. It is an innovative, environmentally friendly source,  an independent outdoor lighting  system that  is cost effective and simple to install almost anywhere.

5.As a professional manufacturer of wind turbines from 400w -50kw ,

we always provide the best solutions of energy saving and environmetal protection .

Main technical data of Hummer H1.25-400w wind generator,more about our products,pls visited :http://www.allwindenergy.com/wind-generator-400w.htm

Rated power 400
Maximum output power 600
Charging voltage (v) 12V
Blade quantity 3
Blade material Nylon
Blade diameter(m) 1.25
Start-up wind speed (m/s) 2.5
Rated wind speed (m/s) 11
Rated rotating rate (r/min) 800
Wind energy utilizing ratio (Cp) 0.4
Generator output Single-phase frequency conversion AC
Output AC frequency(HZ) 0-300
Rated charging current (A) 33.3
The maximum charging current (in a short time)(A) 45
Generator efficiency >0.8
Tower diameter (mm) 65
Tower height(m) 9
weight of generator(kg) 5.5
Suggested Battery 100/120 Ah

Hummer 400w wind-solar hybrid wind generator for park

Boat transport with wave wind power generation

As early as 100 years ago, Bora-year-old French Kui on the use of special equipment to get the energy from the waves. However, 100 years later, the wave power is still stalled, or in the research stage, did not enter the commercial stage of development. 100 years, the countries of researchers have proposed hundreds of wave power program, eventually as this kind of technical issues there is no breakthrough. At the same time, late start of the offshore wind and tidal power have access to a large-scale application stage.

Why is wave power to promote it so difficult? Main transmission, because the waves as tidal wind power generation can not lay cables along the coastline. Make the vast ocean waves can be used up, you need to install a large number of power devices, and a large number of submarine cables for power transmission. Cost of laying cable is very expensive, but also easy to be damaged in the earthquake. In addition, a large number of the laying of submarine cables and installation of wave power installations, the negative impact on the marine environment is enormous.

In order to overcome the existing problems of wave energy generation, Boston University researchers Andrew Leixia Lun, who decided to change the thinking, no longer generating device fixed in the ocean, instead of using removable power boat. By Andre the idea of ​​the ship 50 meters long, 15 meters wide. Power boat can sail under the wind direction and wind strength on a suitable location, where the use of wave windmill power. If bad weather, power boats can always return to port to avoid losses, very flexible.

Wave power generating equipment installed in ships, there are two, one is a float-type power generation equipment, the waves push the float up and down, so as to drive generator; one is the turbine power generation equipment, a turbine spin waves, which drive generators power generation. Electricity generated by the energy stored in the huge capacitor, once the capacitor is fully charged, the ship drove to the port, the power transmission to the public grid. As the sea waves 24 hours, you can continuously generate electricity; and its energy stored in the capacitor in, so you can choose at peak energy release to the public grid, to ease pressure on local power.

Each ship wave power generation 20 hours the average boat can be fully charged, received power to 2 million degrees. If the vessels in turn generating power boats, coastal wind turbines manufacturers residents rely on electricity to meet the needs of the waves. Andrea has produced a small power boat test and found it relatively low cost of electricity is about $ 0.15 per kWh, while wind power cost of $ 0.15-0.24 per kWh, solar power generation cost per kWh $ 0.30.

The use of wave power boat power benefits are obvious, it will not adversely affect the marine environment, power generation facilities will not be natural disasters such as hurricanes and earthquakes damaged. Andre also said that generating ideas can also be used on other ships, because the wind generator manufacturers current number of ships still rely on fuel power generation to meet demand for electricity on board, is not environmentally friendly. Now, if the vessel to the sea wind, solar, wave energy, temperature and other clean energy can be combined, you can gradually get rid of dependence on oil.

China figures large in renewable energy’s future

When an industry is this reliant on government subsidies, the last thing it needs is a dose of market forces. The industry is renewable energy. The market force is China.

The paradox of wind and solar power is that they are too expensive to compete properly with conventional fuels like natural gas, yet lower equipment prices from competition can prove fatal to manufacturers. Last week, U.S. solar panel maker Evergreen Solar went bankrupt. Despite shifting its factory to China, from a state-supported facility in Massachusetts, it couldn’t compete.

China figures large in renewable energy’s future. It already is the world’s largest market for new wind turbines.

In solar, China’s share of global demand is set to rise to 13% in 2015 from 7% this year, says Barclays Capital.

Moreover, if renewable technologies are to wean themselves off state subsidies, the sort of deflation imposed by the expansion of Chinese competitors is necessary.

Chinese demand for renewables is underpinned by economic development and government backing—handy when cash-strapped European governments are cutting subsidies. But Beijing isn’t interested in helping Western suppliers. In wind power, for instance, foreign wind generators manufacturers’ share of the Chinese wind turbines market has collapsed from 80% in 2004 to less than 15% today.

Having conquered their home market, Chinese wind turbine generator  manufacturers aren’t content to stay at home.

Shandong Foreign love wind power

In the current financial crisis, foreign investment in cooling the environment, the wind power industry is still favored by foreign investors. Reporters learned from the Shandong Provincial Foreign Trade and Economic Cooperation, the first 10 months of this year, four projects have been settled in Shandong, a total investment of $ 290 million. The province approved 15 windmill power projects, the proportion of grid electricity accounting for up to 17%.
Shandong Foreign Economic and Trade Office data show that in 1-10 months, the newly approved four wind power projects, total investment of $ 290 million, 060 million U.S. dollars of contracted foreign capital, foreign investment, Shandong Province, accounting for 26.7% of the total, 39.7% and 37.5 %.

Since 2000, the first foreign wind power companies wind power Co., Ltd Yantai Oriental has approved the establishment of Shandong Province has approved 15 wind power projects, with a total investment of 800 million U.S. dollars, 170 million U.S. dollars of contracted foreign capital, foreign capital actually used $ 93 million, foreign air The total installed capacity of 486 MW of power projects, grid electricity 310,220,000 kwh, accounting for the proportion of up to 17%.

Reporters learned that Shandong Province, mainly in wind power, Yantai, Weihai, Dongying, Binzhou, etc., large-scale projects. The average size of 15 projects $ 53,480,000, is the province’s 12 times the size of foreign investment projects. Among them, more than $ 50 million nine.

At the national release of the Foreign Investment Industrial Guidance Catalogue, wind power and other renewable energy projects are encouraged. Shandong Province recently issued “on the implementation of industrial investment advice” in the wind energy industry as energy saving and environmental protection one of the key investment, foreign capital continued growth of wind turbines manufacturer projects have the potential.

From the current master of the situation, Shandong Province, the total invested in about $ 50 million wind project has two TV. Among them, Guohua Resourceful (Rongcheng) Wind Power Ltd. to increase the project approved, will become the province’s largest wind power projects with a total investment of 120 million U.S. dollars of contracted foreign capital $ 22,210,000, installed capacity of 98 MW.

It is understood, the next step, Shandong Province, not only to the introduction of wind power projects, but also to the industry extend to the front, stepping up with Germany, Spain, the Netherlands, Denmark, Australia and other developed countries, wind power equipment technology, international cooperation, the introduction of wind power equipment manufacturing project.

State grid-tied wind turbines of Hummer H12.0-50000W

H12.0-50000W is a typical Humme Wind turbine,which with a series of high-end technologies and refined material, H12.0-50000W wind turbine generators excellent in generation ,stable in output and reliable in practice.

Application of Model H12.0-50000W
It can drive air-condition ( ≤50 horsepower), 10kw water pump or other resistive appliances (≤50KW).

Well used in:
Housing, factory and farm
Telecommunication Station
Monitoring Station (military, hydrology, observatory)
Water-pumping Station
 wind turbines

Rated power(W) 50000
Maximum output power (W) 75000
Charging voltage (V) DC 400
Blade quantity 3
Rotor blade material GRP
Rotor blade diameter (ft.) 39  (12.0m)
Start-up wind speed (mph) 5    (2.0m/s)
Rated wind speed (mph) 25  (11.0m/s)
Rated rotating rate (r/min) 140
Wind energy utilizing ratio (Cp) 0.42
Generator output Frequency conversion AC
Rated charging current (A) 125
The maximum charging current (in a short time) (A) 190
Output AC frequency (Hz) 0~400
Generator efficiency >0.92
Free standing tower diameter (in.) Ø53.1*Ø20.9   (Φ1350×Φ530mm)
Tower height (ft.) 59  (18m)
The weight of generator (lb) 2646  (1200kg)
Suggested Battery (Ah) 800/1500

Scale development of wind power can not alone

Just can not be simple to think that the greater the installed capacity of wind power the better, but the skills to carry out world-scale trends in the fan point of view, progress towards stand-alone capacity is unique. Special Zhengzhou jaw crusher is special to carry out offshore wind power in Europe and China’s “five-second” to carry out the purpose of offshore wind power proposed for offshore wind power has brought new opportunities to carry out, while offshore wind power to carry out the stand-alone windmill  power request a higher capacity, but as long as the skills to carry out the renovation is the high-power fan base opportunities.

Capacity from the international fans see progress stand-alone wind power capacity is equipped with skills to carry out the international trend. In general, integrated fan production, loading and other factors, the greater unit capacity, fan the lower the cost per kW. Based on economic disadvantage, the fan will move more stingy unit capacity to carry out.

Fans from abroad to carry out skills tend to view the late 20th century, mainstream European wind turbine unit capacity of 750 kilowatts, the United States is 500 kW. 21st Century ,1500-2500-kilowatt wind turbines component models for the European mainstream. In 2010, the world’s single fan capacity of 1665 kilowatts uniform. Currently, the German Repower 5 MW and 6 MW, Enercon 4.5 MW and 6 MW wind turbine generator has been the beginning of mass production, and put into operation.

Fans tend to carry out skills from the domestic point of view, in 2008 China accounted for fan capacity MW total installed capacity of wind power accounts for only 56.2% of the national uniform fan unit capacity of only 1046 kilowatts; the end of 2010, China MW wind turbines  manufacturer capacity accounting for the proportion of the total installed capacity of wind power reached 80% of the national uniform fan unit capacity to reach 1,278 kilowatts.

For wind power projects not included in the pla

The Chinese government will approve 26 gigawatts (GW) of grid-connected wind power generating capacity in its first centralised industry development plan, the China Securities Journal reported on Friday.

For wind power projects not included in the plan, access to grid networks and power price subsidies from a renewable power fund would not be considered, the report said, citing an unnamed source.

The plan would essentially consolidate Beijing’s control over rapid expansion in the wind sector that has been doubling year after year since 2005.

China had the world’s largest windmill generator capacity of about 42 GW at the end of 2010, but about a quarter of that capacity was not connected to the grid, in part because of hasty local government approvals that did not match planning.

Local governments were allowed to approve wind projects with an installed capacity of less than 50 megawatts (MW), but they skirted central government approval barriers by nominally breaking up bigger wind turbines manufacturers projects into clusters, with each separate project on paper having less than 50 MW in capacity.

All projects under the new development plan would be approved by the National Energy administration and be completed before the end of 2012, the newspaper report said

China wind power technology to obtain breakthrough plateau

Learned from the Qinghai Economic Commission, a name “to adapt to the characteristics of Qinghai wind resources and wind turbine R & D and Research Network” project was recently approved by experts. Evaluation experts believe that this research filled a large vertica wind turbine blank, means that the Chinese wind power technology in the highlands has made new breakthroughs.
It is understood that the project for the first time using large vertical-axis double asymmetric airfoil of the H-type design, developed for high altitude conditions of high-strength composite blades, electromagnetic brakes and other new equipment. Which, 750KW large vertical axis wind turbine with the installation, operation and maintenance, low cost, low unit cost of electricity distinct advantage. At present, this unit has been run Riyue wind farm grid and grid running time than the industry standards, with the industrial production conditions.
Currently the project applied for four patents for utility model patents and 4, covers the vertical axis wind turbine on large-scale structure of the key technologies, four of which have been authorized utility model patents, and developed a four enterprise standard .
Qinghai has abundant wind energy resources for the development of wind energy industry, but because of the high altitude, the wind density is low, more frequent changes in wind turbines direction, wind power industry has been subject to technical constraints, the slow development. Experts said the study’s success will raise the level of Qinghai wind power equipment manufacturing, wind energy development and extension of industrial chain industry to s

BPA said: appropriate reduction of the wind turbines

State Power Authority that Virgin America (BPA) inform the Energy Authority, it has the right to reduce hydropower transmission of wind power over the region.
BPA asked the Federal Energy Regulatory Commission throw commercial wind farm in June, the complaint file, which will force the BPA to fulfill its transportation contracts. The lawsuit asserts claims of economic recovery is likely to be the operation of wind turbines farm’s next move.
BPA hydropower in the spring of this year when too many restrictions on the use of wind power generators into the grid policy. Wind farm operators, including Iberdrola of renewable energy, are looking for a quick resolution to terminate the policy.
Iberdrola Renewable Energy vice president Don Furman said: “The policy is the most egregious example, BPA did not comply with the rules in line with other transport operators, the Federal Rights Act exists to prevent such discrimination and forced energy transmission the contract. ”
He added: “Pacific Northwest sacred contract is a dangerous precedent and would greatly harm the region’s renewable energy development.”