<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Wind Power,Wind Turbine Manufacturer &#187; wind power</title>
	<atom:link href="http://www.ahjlkj.cn/archives/tag/wind-power/feed" rel="self" type="application/rss+xml" />
	<link>http://www.ahjlkj.cn</link>
	<description>Professional Wind Turbine、Windmill Power、Wind Power Generators in China</description>
	<lastBuildDate>Sun, 05 Sep 2010 14:58:48 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.1</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>North Yongji motor vehicle contracted MW doubly-fed wind power water-cooled</title>
		<link>http://www.ahjlkj.cn/archives/564</link>
		<comments>http://www.ahjlkj.cn/archives/564#comments</comments>
		<pubDate>Fri, 03 Sep 2010 09:28:17 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Wind power station building]]></category>
		<category><![CDATA[wind power]]></category>

		<guid isPermaLink="false">http://www.ahjlkj.cn/?p=564</guid>
		<description><![CDATA[Recently, China&#8217;s wind power generators industry, supporting the largest wind turbine manufacturer &#8211; China North Vehicle Yongji Electric wind power company and the host country has signed a total power of 4.5 million kilowatts, the contract amount of 1.155 billion yuan to 1.5 MW doubly-fed water wind turbine contract, become the largest water-cooled two-fed a [...]]]></description>
			<content:encoded><![CDATA[<p>Recently, China&#8217;s <a href="http://www.allwindenergy.com/Wind_Power_Generator.htm">wind power generators </a>industry, supporting the largest wind turbine manufacturer &#8211; China North Vehicle Yongji Electric wind power company and the host country has signed a total power of 4.5 million kilowatts, the contract amount of 1.155 billion yuan to 1.5 MW doubly-fed water wind turbine contract, become the largest water-cooled two-fed a megawatt-class wind turbines, so that enterprises continue to mainstream models in the megawatt-class playing the role of national leader.<br />
It is understood that the user-developed water-cooled 1.5 MW doubly-fed <a href="http://www.allwindenergy.com/">wind generator</a>, upgrading the company&#8217;s products, through further optimization of the design, each reduction in the weight of 400 kilograms, the contract will be completed in late 2011 delivery . MW of wind power to motor assembly, the company started construction in April this year, megawatt-class wind power motor assembly plant, permanent plant project, to meet the company the next 3-5 years to expand wind power market needs.<br />
Yongji motor to green clean energy as a strategic objective of sustainable development companies, new product research and development of <a href="http://www.allwindenergy.com/Wind_Power_Turbine.htm">wind power turbines </a> has not only been the state policy and funding on the great support, but also has included in the State Economic and Trade Commission in 2002 Technical Innovation Project, Ministry of Science, &#8220;10 5 &#8220;research projects, take the&#8221; Eleventh Five-Year &#8220;National Science and Technology Support Programme&#8221; adapt to the complex conditions of high-power wind turbine industrialization &#8220;, in May 2009, the company was included in the Shanxi provincial government 2009-2011&#8243; equipment manufacturing restructuring and revitalization plan &#8220;in the new energy equipment <a href="http://www.allwindenergy.com/Wind_Generator.htm">wind generator manufacturing</a> base. The company set up wind power product quality enhancement projects set, new technology, new methods of capturing wind power key Bujian the rotor assembly Zhou put Chaochai  problem and developed through exploration Yizheng Tao Yun Hang  of technical data, reduce Zhiliang loss of 600 million yuan. Wind on the staff to enhance the quality of wire wrapped ring, the product appearance of quality standards, the motor assembly cleaning job training, the overall improve products quality.<br />
<h3>Related Articals</h3>
<ul class="related_post">
<li>2010年08月27日 &#8212; <a href="http://www.ahjlkj.cn/archives/557" title="Chongqing wind power will become industries Jiang New District">Chongqing wind power will become industries Jiang New District</a></li>
<li>2010年08月21日 &#8212; <a href="http://www.ahjlkj.cn/archives/551" title="Wind Power Outlook">Wind Power Outlook</a></li>
<li>2010年08月19日 &#8212; <a href="http://www.ahjlkj.cn/archives/548" title="Total installed capacity of wind power in Inner Mongolia break 10 million kilowatts">Total installed capacity of wind power in Inner Mongolia break 10 million kilowatts</a></li>
<li>2010年08月7日 &#8212; <a href="http://www.ahjlkj.cn/archives/532" title="China&#8217;s highest wind power project began lifting">China&#8217;s highest wind power project began lifting</a></li>
<li>2010年08月3日 &#8212; <a href="http://www.ahjlkj.cn/archives/528" title="Faced with great opportunities for wind power">Faced with great opportunities for wind power</a></li>
<li>2010年07月23日 &#8212; <a href="http://www.ahjlkj.cn/archives/516" title="China&#8217;s wind power machine companies face four major challenges">China&#8217;s wind power machine companies face four major challenges</a></li>
<li>2010年07月20日 &#8212; <a href="http://www.ahjlkj.cn/archives/514" title="Wind power can use wire and cable will be the focus of future development">Wind power can use wire and cable will be the focus of future development</a></li>
<li>2010年07月3日 &#8212; <a href="http://www.ahjlkj.cn/archives/501" title="Need to eliminate bottlenecks in wind power">Need to eliminate bottlenecks in wind power</a></li>
<li>2010年06月28日 &#8212; <a href="http://www.ahjlkj.cn/archives/494" title="New wind power installed capacity of 10 million kilowatts of wind power development in Europe">New wind power installed capacity of 10 million kilowatts of wind power development in Europe</a></li>
<li>2010年05月30日 &#8212; <a href="http://www.ahjlkj.cn/archives/461" title="State&#8217;s first 10 million kilowatts of wind power base and power generation started">State&#8217;s first 10 million kilowatts of wind power base and power generation started</a></li>
<li>2010年05月29日 &#8212; <a href="http://www.ahjlkj.cn/archives/457" title="Urgent need for overall planning of offshore wind power">Urgent need for overall planning of offshore wind power</a></li>
<li>2010年05月24日 &#8212; <a href="http://www.ahjlkj.cn/archives/453" title="Wind power forward in dispute">Wind power forward in dispute</a></li>
<li>2010年05月22日 &#8212; <a href="http://www.ahjlkj.cn/archives/450" title="Offshore wind power makes people feel happy and worry">Offshore wind power makes people feel happy and worry</a></li>
<li>2010年05月20日 &#8212; <a href="http://www.ahjlkj.cn/archives/447" title="On the application of wind power industry overview PLC">On the application of wind power industry overview PLC</a></li>
<li>2010年05月18日 &#8212; <a href="http://www.ahjlkj.cn/archives/442" title="World wind power equipment giant settled Da">World wind power equipment giant settled Da</a></li>
</ul>
]]></content:encoded>
			<wfw:commentRss>http://www.ahjlkj.cn/archives/564/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Chongqing wind power will become industries Jiang New District</title>
		<link>http://www.ahjlkj.cn/archives/557</link>
		<comments>http://www.ahjlkj.cn/archives/557#comments</comments>
		<pubDate>Fri, 27 Aug 2010 13:36:01 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Wind Power News]]></category>
		<category><![CDATA[wind power]]></category>

		<guid isPermaLink="false">http://www.ahjlkj.cn/?p=557</guid>
		<description><![CDATA[Recently, the Chongqing municipal government announced two strategic planning in the New River, which wind power generators equipment to become the second largest strategic industries. Related departments plan to integrate wind power generator system, based on focus on developing key components and supporting components manufacturing, while China Shipbuilding Heavy Industry (Chongqing) Sea Wind Power Equipment [...]]]></description>
			<content:encoded><![CDATA[<p>Recently, the Chongqing municipal government announced two strategic planning in the New River, which <a href="http://www.allwindenergy.com/Wind_Power_Generator.htm">wind power generators</a> equipment to become the second largest strategic industries. Related departments plan to integrate wind power generator system, based on focus on developing key components and supporting components manufacturing, while China Shipbuilding Heavy Industry (Chongqing) Sea Wind Power Equipment Co., Ltd. will install two rivers in Chongqing New <a href="http://www.allwindenergy.com/">wind generators</a> industry play a more important role.<br />
Chongqing wind power equipment company Shanghai has assumed &#8220;national offshore <a href="http://www.allwindenergy.com/Wind_Turbine_Generator.htm">wind turbine generator</a> engineering technology research center&#8221; of this task, the same time, as a &#8220;wind Chongqing Engineering Research Center,&#8221; New River in two core industry, the second largest development strategies play a pivotal effect.<br />
Mu Qian, the company as major projects in Chongqing, Yi pair of local 风 chain driven power industry has played a positive role in end of this year, will form a two million kilowatts of wind power equipment and supporting Ling Bujian production capacity to 20 billion yuan of industrial Dai Dong Chain Sales. 2015, Chongqing wind power equipment industry will complete the 20 billion yuan investment, the formation of two million kilowatts of wind power terrestrial and marine wind power capacity and improve the <a href="http://www.allwindenergy.com/">wind turbines</a> supporting system components, output value of 40 billion yuan into the domestic TV industry cluster of wind power .<br />
<h3>Related Articals</h3>
<ul class="related_post">
<li>2010年09月3日 &#8212; <a href="http://www.ahjlkj.cn/archives/564" title="North Yongji motor vehicle contracted MW doubly-fed wind power water-cooled">North Yongji motor vehicle contracted MW doubly-fed wind power water-cooled</a></li>
<li>2010年08月21日 &#8212; <a href="http://www.ahjlkj.cn/archives/551" title="Wind Power Outlook">Wind Power Outlook</a></li>
<li>2010年08月19日 &#8212; <a href="http://www.ahjlkj.cn/archives/548" title="Total installed capacity of wind power in Inner Mongolia break 10 million kilowatts">Total installed capacity of wind power in Inner Mongolia break 10 million kilowatts</a></li>
<li>2010年08月7日 &#8212; <a href="http://www.ahjlkj.cn/archives/532" title="China&#8217;s highest wind power project began lifting">China&#8217;s highest wind power project began lifting</a></li>
<li>2010年08月3日 &#8212; <a href="http://www.ahjlkj.cn/archives/528" title="Faced with great opportunities for wind power">Faced with great opportunities for wind power</a></li>
<li>2010年07月23日 &#8212; <a href="http://www.ahjlkj.cn/archives/516" title="China&#8217;s wind power machine companies face four major challenges">China&#8217;s wind power machine companies face four major challenges</a></li>
<li>2010年07月20日 &#8212; <a href="http://www.ahjlkj.cn/archives/514" title="Wind power can use wire and cable will be the focus of future development">Wind power can use wire and cable will be the focus of future development</a></li>
<li>2010年07月3日 &#8212; <a href="http://www.ahjlkj.cn/archives/501" title="Need to eliminate bottlenecks in wind power">Need to eliminate bottlenecks in wind power</a></li>
<li>2010年06月28日 &#8212; <a href="http://www.ahjlkj.cn/archives/494" title="New wind power installed capacity of 10 million kilowatts of wind power development in Europe">New wind power installed capacity of 10 million kilowatts of wind power development in Europe</a></li>
<li>2010年05月30日 &#8212; <a href="http://www.ahjlkj.cn/archives/461" title="State&#8217;s first 10 million kilowatts of wind power base and power generation started">State&#8217;s first 10 million kilowatts of wind power base and power generation started</a></li>
<li>2010年05月29日 &#8212; <a href="http://www.ahjlkj.cn/archives/457" title="Urgent need for overall planning of offshore wind power">Urgent need for overall planning of offshore wind power</a></li>
<li>2010年05月24日 &#8212; <a href="http://www.ahjlkj.cn/archives/453" title="Wind power forward in dispute">Wind power forward in dispute</a></li>
<li>2010年05月22日 &#8212; <a href="http://www.ahjlkj.cn/archives/450" title="Offshore wind power makes people feel happy and worry">Offshore wind power makes people feel happy and worry</a></li>
<li>2010年05月20日 &#8212; <a href="http://www.ahjlkj.cn/archives/447" title="On the application of wind power industry overview PLC">On the application of wind power industry overview PLC</a></li>
<li>2010年05月18日 &#8212; <a href="http://www.ahjlkj.cn/archives/442" title="World wind power equipment giant settled Da">World wind power equipment giant settled Da</a></li>
</ul>
]]></content:encoded>
			<wfw:commentRss>http://www.ahjlkj.cn/archives/557/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Wind Power Outlook</title>
		<link>http://www.ahjlkj.cn/archives/551</link>
		<comments>http://www.ahjlkj.cn/archives/551#comments</comments>
		<pubDate>Sat, 21 Aug 2010 14:09:15 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Wind Power News]]></category>
		<category><![CDATA[wind power]]></category>

		<guid isPermaLink="false">http://www.ahjlkj.cn/?p=551</guid>
		<description><![CDATA[Usually people think that wind power generator wind power solely by the decision, always wanted to buy a bigger wind turbine, which is not correct. The current to the battery charging wind turbines only, the energy stored by the battery up, people eventually use electric power, size and battery size have a closer relationship. Power [...]]]></description>
			<content:encoded><![CDATA[<p>Usually people think that <a href="http://www.allwindenergy.com/Wind_Power_Generator.htm">wind power generator </a>wind power solely by the decision, always wanted to buy a bigger wind turbine, which is not correct. The current to the battery charging wind turbines only, the energy stored by the battery up, people eventually use electric power, size and battery size have a closer relationship. Power depends on the size of even the size of wind, not just the size of the power head. On the mainland, a <a href="http://www.allwindenergy.com/Small_Wind_Turbines.htm">small wind turbine </a>will be more appropriate than large. Because it is easier to drive and a small amount of wind power generation, continuous small wind, strong wind better than the moment a large supply of energy. When no wind when the wind it can also be caused by normal use of electricity, that is a 200W <a href="http://www.allwindenergy.com/Wind_Turbine_Generator.htm">wind turbine generator </a>can also be a large battery and inverter by co-use, access to 500W or 1000W and even more power out.<br />
Use of wind generators, wind energy is pouring into our family used to the standard electricity, the savings level is obvious, a family only 20 yuan a year of electricity cost of battery fluid. Now the <a href="http://www.allwindenergy.com/">wind turbin</a>e performance than a few years ago a great improvement, previously used only in a few remote areas, wind generators connected directly to power a 15W light bulb, one out of a dark and often damage the bulb. And now because of technical progress, the use of advanced chargers, inverters, <a href="http://www.allwindenergy.com/">wind generators</a> as a certain scientific and technological content of the small systems, and can under certain conditions, instead of the normal electricity. Mountain to the system can not be a perennial money-lights; highway signs used it to do the night lights; mountain children can study up under fluorescent lights; urban high-rise roof, <a href="http://www.allwindenergy.com/Wind_Turbine.htm">wind turbine  manufacturer </a>can also be used, which not only save but also real Green Power. Domestic wind generators, not only to prevent blackouts, but also increase the zest for life. In the tourism area, border, school, military and even behind the mountain, <a href="http://www.allwindenergy.com/Home_Wind_Turbine.htm">home wind turbine</a> procurement is becoming a hot one. Radio enthusiasts could use their own technology in the wind power generation services for the mountain people, so that people watch television and lighting synchronized with the city, but also make their own enrichment work.<br />
<h3>Related Articals</h3>
<ul class="related_post">
<li>2010年09月3日 &#8212; <a href="http://www.ahjlkj.cn/archives/564" title="North Yongji motor vehicle contracted MW doubly-fed wind power water-cooled">North Yongji motor vehicle contracted MW doubly-fed wind power water-cooled</a></li>
<li>2010年08月27日 &#8212; <a href="http://www.ahjlkj.cn/archives/557" title="Chongqing wind power will become industries Jiang New District">Chongqing wind power will become industries Jiang New District</a></li>
<li>2010年08月19日 &#8212; <a href="http://www.ahjlkj.cn/archives/548" title="Total installed capacity of wind power in Inner Mongolia break 10 million kilowatts">Total installed capacity of wind power in Inner Mongolia break 10 million kilowatts</a></li>
<li>2010年08月7日 &#8212; <a href="http://www.ahjlkj.cn/archives/532" title="China&#8217;s highest wind power project began lifting">China&#8217;s highest wind power project began lifting</a></li>
<li>2010年08月3日 &#8212; <a href="http://www.ahjlkj.cn/archives/528" title="Faced with great opportunities for wind power">Faced with great opportunities for wind power</a></li>
<li>2010年07月23日 &#8212; <a href="http://www.ahjlkj.cn/archives/516" title="China&#8217;s wind power machine companies face four major challenges">China&#8217;s wind power machine companies face four major challenges</a></li>
<li>2010年07月20日 &#8212; <a href="http://www.ahjlkj.cn/archives/514" title="Wind power can use wire and cable will be the focus of future development">Wind power can use wire and cable will be the focus of future development</a></li>
<li>2010年07月3日 &#8212; <a href="http://www.ahjlkj.cn/archives/501" title="Need to eliminate bottlenecks in wind power">Need to eliminate bottlenecks in wind power</a></li>
<li>2010年06月28日 &#8212; <a href="http://www.ahjlkj.cn/archives/494" title="New wind power installed capacity of 10 million kilowatts of wind power development in Europe">New wind power installed capacity of 10 million kilowatts of wind power development in Europe</a></li>
<li>2010年05月30日 &#8212; <a href="http://www.ahjlkj.cn/archives/461" title="State&#8217;s first 10 million kilowatts of wind power base and power generation started">State&#8217;s first 10 million kilowatts of wind power base and power generation started</a></li>
<li>2010年05月29日 &#8212; <a href="http://www.ahjlkj.cn/archives/457" title="Urgent need for overall planning of offshore wind power">Urgent need for overall planning of offshore wind power</a></li>
<li>2010年05月24日 &#8212; <a href="http://www.ahjlkj.cn/archives/453" title="Wind power forward in dispute">Wind power forward in dispute</a></li>
<li>2010年05月22日 &#8212; <a href="http://www.ahjlkj.cn/archives/450" title="Offshore wind power makes people feel happy and worry">Offshore wind power makes people feel happy and worry</a></li>
<li>2010年05月20日 &#8212; <a href="http://www.ahjlkj.cn/archives/447" title="On the application of wind power industry overview PLC">On the application of wind power industry overview PLC</a></li>
<li>2010年05月18日 &#8212; <a href="http://www.ahjlkj.cn/archives/442" title="World wind power equipment giant settled Da">World wind power equipment giant settled Da</a></li>
</ul>
]]></content:encoded>
			<wfw:commentRss>http://www.ahjlkj.cn/archives/551/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Total installed capacity of wind power in Inner Mongolia break 10 million kilowatts</title>
		<link>http://www.ahjlkj.cn/archives/548</link>
		<comments>http://www.ahjlkj.cn/archives/548#comments</comments>
		<pubDate>Fri, 20 Aug 2010 03:17:26 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Wind Power News]]></category>
		<category><![CDATA[wind power]]></category>

		<guid isPermaLink="false">http://www.ahjlkj.cn/?p=548</guid>
		<description><![CDATA[August 19, 2010 3-day Inner Mongolia, wind, solar power industry, power industry exhibition cum International Convention and Exhibition Centre in Inner Mongolia opened.
According to reports, Inner Mongolia, a vast, wind energy, solar energy resource rich wind energy resources now total reserves of about 898 million kilowatts, which can be developed using wind energy resource reserves [...]]]></description>
			<content:encoded><![CDATA[<p>August 19, 2010 3-day Inner Mongolia, wind, solar power industry, power industry exhibition cum International Convention and Exhibition Centre in Inner Mongolia opened.</p>
<p>According to reports, Inner Mongolia, a vast, <a href="http://www.allwindenergy.com/Wind_Energy.htm">wind energy</a>, solar energy resource rich wind energy resources now total reserves of about 898 million kilowatts, which can be developed using wind energy resource reserves of 1.5 million kilowatts, accounting for development and utilization of wind energy resources can be half of the total, ranking first. Wind energy resources in our region has a wide distribution, good quality, good stability, continuity of strong, non-destructive typhoons and hurricanes, high wind energy utilization features a bright future of wind power development. As of the end of June 2010, and net installed capacity of <a href="http://www.allwindenergy.com/">wind generators</a> in Inner Mongolia has reached 7.61 million kilowatts; annual generation capacity of 9.8 billion kwh, ranking first in the country. Expected end of 2010, total installed capacity of wind power in Inner Mongolia is expected to exceed 10 million kilowatts. Meanwhile, in Inner Mongolia is rich in solar energy resources, ranking second possession, global solar radiation per square meter in 4800 ~ 6400 MJ, annual sunshine <a href="http://www.allwindenergy.com/">wind turbines</a> time is 2600 ~ 3200 hours, solar high-value areas. With a wealth of solar energy in Inner Mongolia and silicon and mineral resources, in recent years to develop renewable energy, to create photovoltaic industry base.<br />
<h3>Related Articals</h3>
<ul class="related_post">
<li>2010年09月3日 &#8212; <a href="http://www.ahjlkj.cn/archives/564" title="North Yongji motor vehicle contracted MW doubly-fed wind power water-cooled">North Yongji motor vehicle contracted MW doubly-fed wind power water-cooled</a></li>
<li>2010年08月27日 &#8212; <a href="http://www.ahjlkj.cn/archives/557" title="Chongqing wind power will become industries Jiang New District">Chongqing wind power will become industries Jiang New District</a></li>
<li>2010年08月21日 &#8212; <a href="http://www.ahjlkj.cn/archives/551" title="Wind Power Outlook">Wind Power Outlook</a></li>
<li>2010年08月7日 &#8212; <a href="http://www.ahjlkj.cn/archives/532" title="China&#8217;s highest wind power project began lifting">China&#8217;s highest wind power project began lifting</a></li>
<li>2010年08月3日 &#8212; <a href="http://www.ahjlkj.cn/archives/528" title="Faced with great opportunities for wind power">Faced with great opportunities for wind power</a></li>
<li>2010年07月23日 &#8212; <a href="http://www.ahjlkj.cn/archives/516" title="China&#8217;s wind power machine companies face four major challenges">China&#8217;s wind power machine companies face four major challenges</a></li>
<li>2010年07月20日 &#8212; <a href="http://www.ahjlkj.cn/archives/514" title="Wind power can use wire and cable will be the focus of future development">Wind power can use wire and cable will be the focus of future development</a></li>
<li>2010年07月3日 &#8212; <a href="http://www.ahjlkj.cn/archives/501" title="Need to eliminate bottlenecks in wind power">Need to eliminate bottlenecks in wind power</a></li>
<li>2010年06月28日 &#8212; <a href="http://www.ahjlkj.cn/archives/494" title="New wind power installed capacity of 10 million kilowatts of wind power development in Europe">New wind power installed capacity of 10 million kilowatts of wind power development in Europe</a></li>
<li>2010年05月30日 &#8212; <a href="http://www.ahjlkj.cn/archives/461" title="State&#8217;s first 10 million kilowatts of wind power base and power generation started">State&#8217;s first 10 million kilowatts of wind power base and power generation started</a></li>
<li>2010年05月29日 &#8212; <a href="http://www.ahjlkj.cn/archives/457" title="Urgent need for overall planning of offshore wind power">Urgent need for overall planning of offshore wind power</a></li>
<li>2010年05月24日 &#8212; <a href="http://www.ahjlkj.cn/archives/453" title="Wind power forward in dispute">Wind power forward in dispute</a></li>
<li>2010年05月22日 &#8212; <a href="http://www.ahjlkj.cn/archives/450" title="Offshore wind power makes people feel happy and worry">Offshore wind power makes people feel happy and worry</a></li>
<li>2010年05月20日 &#8212; <a href="http://www.ahjlkj.cn/archives/447" title="On the application of wind power industry overview PLC">On the application of wind power industry overview PLC</a></li>
<li>2010年05月18日 &#8212; <a href="http://www.ahjlkj.cn/archives/442" title="World wind power equipment giant settled Da">World wind power equipment giant settled Da</a></li>
</ul>
]]></content:encoded>
			<wfw:commentRss>http://www.ahjlkj.cn/archives/548/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>China&#8217;s highest wind power project began lifting</title>
		<link>http://www.ahjlkj.cn/archives/532</link>
		<comments>http://www.ahjlkj.cn/archives/532#comments</comments>
		<pubDate>Sat, 07 Aug 2010 14:03:46 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Wind Power News]]></category>
		<category><![CDATA[wind power]]></category>

		<guid isPermaLink="false">http://www.ahjlkj.cn/?p=532</guid>
		<description><![CDATA[August 1, owned by the China Metallurgical Group Co., Ltd. Shanghai Bao Ye Luo Ping Yunnan Datang construction of Wind Power (1) project started lifting floor fan installation project. As the project leader gave an order, two large cranes will be a 21.94 meters long and weighs 37.9 tons of the Tower Drum lifting slowly, [...]]]></description>
			<content:encoded><![CDATA[<p>August 1, owned by the China Metallurgical Group Co., Ltd. Shanghai Bao Ye Luo Ping Yunnan Datang construction of Wind Power (1) project started lifting floor fan installation project. As the project leader gave an order, two large cranes will be a 21.94 meters long and weighs 37.9 tons of the Tower Drum lifting slowly, smoothly placed in the base ring.</p>
<p>Luo mountain <a href="http://www.allwindenergy.com/Wind_Power_Generator.htm">wind power generator </a>equipment installation project is contracted Shanghai Bao Ye Group&#8217;s first wind turbine installation, construction sites an average elevation of more than 3300 meters, is currently the highest installed wind power project. Shanghai Bao Ye Group Project Department members braved strong winds, fog, high altitude hypoxia in the construction case, the <a href="http://www.allwindenergy.com/">wind generators </a>carry forward fearless tired, the spirit of unity and pragmatic, well-prepared, carefully planned, well-construction organizations to develop programs to ensure construction shelf, on time and safely completed.<br />
<h3>Related Articals</h3>
<ul class="related_post">
<li>2010年09月3日 &#8212; <a href="http://www.ahjlkj.cn/archives/564" title="North Yongji motor vehicle contracted MW doubly-fed wind power water-cooled">North Yongji motor vehicle contracted MW doubly-fed wind power water-cooled</a></li>
<li>2010年08月27日 &#8212; <a href="http://www.ahjlkj.cn/archives/557" title="Chongqing wind power will become industries Jiang New District">Chongqing wind power will become industries Jiang New District</a></li>
<li>2010年08月21日 &#8212; <a href="http://www.ahjlkj.cn/archives/551" title="Wind Power Outlook">Wind Power Outlook</a></li>
<li>2010年08月19日 &#8212; <a href="http://www.ahjlkj.cn/archives/548" title="Total installed capacity of wind power in Inner Mongolia break 10 million kilowatts">Total installed capacity of wind power in Inner Mongolia break 10 million kilowatts</a></li>
<li>2010年08月3日 &#8212; <a href="http://www.ahjlkj.cn/archives/528" title="Faced with great opportunities for wind power">Faced with great opportunities for wind power</a></li>
<li>2010年07月23日 &#8212; <a href="http://www.ahjlkj.cn/archives/516" title="China&#8217;s wind power machine companies face four major challenges">China&#8217;s wind power machine companies face four major challenges</a></li>
<li>2010年07月20日 &#8212; <a href="http://www.ahjlkj.cn/archives/514" title="Wind power can use wire and cable will be the focus of future development">Wind power can use wire and cable will be the focus of future development</a></li>
<li>2010年07月3日 &#8212; <a href="http://www.ahjlkj.cn/archives/501" title="Need to eliminate bottlenecks in wind power">Need to eliminate bottlenecks in wind power</a></li>
<li>2010年06月28日 &#8212; <a href="http://www.ahjlkj.cn/archives/494" title="New wind power installed capacity of 10 million kilowatts of wind power development in Europe">New wind power installed capacity of 10 million kilowatts of wind power development in Europe</a></li>
<li>2010年05月30日 &#8212; <a href="http://www.ahjlkj.cn/archives/461" title="State&#8217;s first 10 million kilowatts of wind power base and power generation started">State&#8217;s first 10 million kilowatts of wind power base and power generation started</a></li>
<li>2010年05月29日 &#8212; <a href="http://www.ahjlkj.cn/archives/457" title="Urgent need for overall planning of offshore wind power">Urgent need for overall planning of offshore wind power</a></li>
<li>2010年05月24日 &#8212; <a href="http://www.ahjlkj.cn/archives/453" title="Wind power forward in dispute">Wind power forward in dispute</a></li>
<li>2010年05月22日 &#8212; <a href="http://www.ahjlkj.cn/archives/450" title="Offshore wind power makes people feel happy and worry">Offshore wind power makes people feel happy and worry</a></li>
<li>2010年05月20日 &#8212; <a href="http://www.ahjlkj.cn/archives/447" title="On the application of wind power industry overview PLC">On the application of wind power industry overview PLC</a></li>
<li>2010年05月18日 &#8212; <a href="http://www.ahjlkj.cn/archives/442" title="World wind power equipment giant settled Da">World wind power equipment giant settled Da</a></li>
</ul>
]]></content:encoded>
			<wfw:commentRss>http://www.ahjlkj.cn/archives/532/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Faced with great opportunities for wind power</title>
		<link>http://www.ahjlkj.cn/archives/528</link>
		<comments>http://www.ahjlkj.cn/archives/528#comments</comments>
		<pubDate>Tue, 03 Aug 2010 14:59:16 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Wind Power News]]></category>
		<category><![CDATA[wind power]]></category>

		<guid isPermaLink="false">http://www.ahjlkj.cn/?p=528</guid>
		<description><![CDATA[2009, new wind power generator  capacity in China 25100MW, is more than double the 2008 12100MW. iSuppli&#8217;s figures, last year about the world&#8217;s new small wind turbines capacity of one third, and the last five years of sustained development of China over Spain in 2009, becoming the world&#8217;s third wind power to provide land. [...]]]></description>
			<content:encoded><![CDATA[<p>2009, new <a href="http://www.allwindenergy.com/Wind_Power_Generator.htm">wind power generator </a> capacity in China 25100MW, is more than double the 2008 12100MW. iSuppli&#8217;s figures, last year about the world&#8217;s new <a href="http://www.allwindenergy.com/Small_Wind_Turbines.htm">small wind turbines</a> capacity of one third, and the last five years of sustained development of China over Spain in 2009, becoming the world&#8217;s third wind power to provide land. Three years ago, the Chinese wind power capacity worldwide is only ranked 10, power generation capacity is 6100MW.</p>
<p>China wind power market received strong support from local procurement rules. China Development and Reform Commission, particularly the provisions of the domestic wind power equipment procurement rate of 70% can be allowed to build.</p>
<p>Under the influence of the policy, the current account of domestic new orders for <a href="http://www.allwindenergy.com/">wind turbines</a> more than 76%, while China&#8217;s total wind power accounted for 62% of the market. iSuppli&#8217;s figures show a total of view, in 2009 several of the largest wind power companies &#8211; in the Division Uno, Goldwind Science and Technology and the DEC, 55% of the market. In addition, the next three years, will produce 900 million U.S. dollars annually over the field associated with the new business.<br />
<h3>Related Articals</h3>
<ul class="related_post">
<li>2010年09月3日 &#8212; <a href="http://www.ahjlkj.cn/archives/564" title="North Yongji motor vehicle contracted MW doubly-fed wind power water-cooled">North Yongji motor vehicle contracted MW doubly-fed wind power water-cooled</a></li>
<li>2010年08月27日 &#8212; <a href="http://www.ahjlkj.cn/archives/557" title="Chongqing wind power will become industries Jiang New District">Chongqing wind power will become industries Jiang New District</a></li>
<li>2010年08月21日 &#8212; <a href="http://www.ahjlkj.cn/archives/551" title="Wind Power Outlook">Wind Power Outlook</a></li>
<li>2010年08月19日 &#8212; <a href="http://www.ahjlkj.cn/archives/548" title="Total installed capacity of wind power in Inner Mongolia break 10 million kilowatts">Total installed capacity of wind power in Inner Mongolia break 10 million kilowatts</a></li>
<li>2010年08月7日 &#8212; <a href="http://www.ahjlkj.cn/archives/532" title="China&#8217;s highest wind power project began lifting">China&#8217;s highest wind power project began lifting</a></li>
<li>2010年07月23日 &#8212; <a href="http://www.ahjlkj.cn/archives/516" title="China&#8217;s wind power machine companies face four major challenges">China&#8217;s wind power machine companies face four major challenges</a></li>
<li>2010年07月20日 &#8212; <a href="http://www.ahjlkj.cn/archives/514" title="Wind power can use wire and cable will be the focus of future development">Wind power can use wire and cable will be the focus of future development</a></li>
<li>2010年07月3日 &#8212; <a href="http://www.ahjlkj.cn/archives/501" title="Need to eliminate bottlenecks in wind power">Need to eliminate bottlenecks in wind power</a></li>
<li>2010年06月28日 &#8212; <a href="http://www.ahjlkj.cn/archives/494" title="New wind power installed capacity of 10 million kilowatts of wind power development in Europe">New wind power installed capacity of 10 million kilowatts of wind power development in Europe</a></li>
<li>2010年05月30日 &#8212; <a href="http://www.ahjlkj.cn/archives/461" title="State&#8217;s first 10 million kilowatts of wind power base and power generation started">State&#8217;s first 10 million kilowatts of wind power base and power generation started</a></li>
<li>2010年05月29日 &#8212; <a href="http://www.ahjlkj.cn/archives/457" title="Urgent need for overall planning of offshore wind power">Urgent need for overall planning of offshore wind power</a></li>
<li>2010年05月24日 &#8212; <a href="http://www.ahjlkj.cn/archives/453" title="Wind power forward in dispute">Wind power forward in dispute</a></li>
<li>2010年05月22日 &#8212; <a href="http://www.ahjlkj.cn/archives/450" title="Offshore wind power makes people feel happy and worry">Offshore wind power makes people feel happy and worry</a></li>
<li>2010年05月20日 &#8212; <a href="http://www.ahjlkj.cn/archives/447" title="On the application of wind power industry overview PLC">On the application of wind power industry overview PLC</a></li>
<li>2010年05月18日 &#8212; <a href="http://www.ahjlkj.cn/archives/442" title="World wind power equipment giant settled Da">World wind power equipment giant settled Da</a></li>
</ul>
]]></content:encoded>
			<wfw:commentRss>http://www.ahjlkj.cn/archives/528/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>China&#8217;s wind power machine companies face four major challenges</title>
		<link>http://www.ahjlkj.cn/archives/516</link>
		<comments>http://www.ahjlkj.cn/archives/516#comments</comments>
		<pubDate>Fri, 23 Jul 2010 14:15:12 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Wind Power News]]></category>
		<category><![CDATA[wind power]]></category>

		<guid isPermaLink="false">http://www.ahjlkj.cn/?p=516</guid>
		<description><![CDATA[Since 2004, driven by national policy, China&#8217;s wind power industry with Chinese-style machine speed leaps and bounds. Up to now, the whole company at least 80 more than the size of most enterprises and capacity has expanded each year and for the fans now do not have to worry about sales. With the Chinese government [...]]]></description>
			<content:encoded><![CDATA[<p>Since 2004, driven by national policy, China&#8217;s wind power industry with Chinese-style machine speed leaps and bounds. Up to now, the whole company at least 80 more than the size of most enterprises and capacity has expanded each year and for the fans now do not have to worry about sales. With the Chinese government made commitments to the world: for 2020, China&#8217;s non-fossil energy in the primary energy consumption ratio of 15% of GDP unit carbon emissions below 2005 levels by 40% -45%, wind machine <a href="http://www.allwindenergy.com/">wind generator manufacturers</a> warm again one was excited. Needless to say, the <a href="http://www.allwindenergy.com/Wind_Power_Generator.htm">wind power generator</a> industry will flourish, but to make more smooth the road ahead is required to respond to these challenges well.<br />
Difficult to balance the scale of production<br />
The field of wind power are often full of optimism, as the country of seven million kilowatts of wind power base level determination, machine<a href="http://www.allwindenergy.com"> wind turbines  manufacturers </a>generally follow the principle of the nearest building of production bases, the rapid expansion of production scale, a scale larger than general shops.<br />
However, the expansion of the scale as the double-edged sword, if the wind power industry development as well as expected, the machine manufacturers can seize this rare opportunity, increase sales, large-scale benefits to enterprises. If the wind power industry in the situation of stagnation or economic crisis, a situation similar to production, the large-scale enterprises to become cumbersome, liquidity shortage will be inevitable.<br />
What factors will affect the <a href="http://www.allwindenergy.com/Wind_Power_Turbine.htm">wind power turbines </a> industry the scale of production?<br />
Now, hard to bear the brunt of wind power. In accordance with the existing network architecture and load capacity, National Grid Electric Power Research Institute predicts that by 2020 wind power capacity of up to 1 million kilowatts of installed capacity of the national planning objective is 150 000 000 -2 100 million kilowatts, 1 / 3 or more grid capacity could not affect the wind farm owners for investment. When large-scale power generation groups meet the state&#8217;s non-hydroelectric renewable energy accounting for 8%, the expansion of installed capacity of power are gone, fans will demand the risk of stagnation.<br />
Moreover, whether the continuation of state policy is also important factors. Policy support to a large extent, funding support, such as tax breaks, financial subsidies, land support. When our economic situation has continued to maintain growth when, Duiyu support wind power Chanye not a Wen Ti, and once Chuxianquanguo or the world economic situation, the situation down, <a href="http://www.allwindenergy.com/Small_Wind_Turbines.htm">small wind turbines</a> industry Zijin there may be Ying Xiang Hui.<br />
Representative from the world view of the country&#8217;s development process, policies continued support very few intermediate ups and downs will likely stage.<br />
Overseas markets blocked<br />
China&#8217;s  <a href="http://www.allwindenergy.com/Home_Wind_Turbine.htm">home wind turbines</a> machine enterprises begin to consider a few years ago to open up overseas markets, but the actual situation is not optimistic. Goldwind Yu Yao, Director of Public Affairs, &#8220;China Energy Report,&#8221; told reporters: &#8220;We need to be addressed three questions: First, market access certification; Second, bank credit facilities. On overseas markets, especially European and American markets, banks in the import and export a very important role to play, many fans of the funds the buyer to purchase access to bank credit by the bank in order to ensure the safe use of funds, resources and assessment of Chinese fans will organize enterprise products, price, enterprise strength, credit so inspected; Third, politicians in Europe and America have a fear that low prices of Chinese products, taking into account the protection of the local<a href="http://www.allwindenergy.com/Vertical_Wind_Turbine.htm"> vertical wind turbines manufacturing</a> industry, will be more Chinese companies not only expect to sell their products on the market, more To do something in the local investment, particularly in the past two years by the financial crisis, this tendency will become more intense. &#8221;<br />
Three questions which are not easy to solve, and market access certification in China is difficult to have a say in the international arena; fans the quality of products and credit needs of the test of time; trade friction is a long topic.<br />
China&#8217;s wind power equipment, mainly by building <a href="http://www.allwindenergy.com/Wind_Turbine_Generator.htm">wind turbine generators</a> farms to absorb the domestic, and overseas markets at present does not seem so urgent. However, there is indeed overseas markets higher profits and greater development space, and have to make up for the role of changes in the domestic market situation, so wind power business to expand overseas markets is a matter of time.<br />
Grab market unit price of imports decreased<br />
Of wind turbines compared with the foreign unit, the main competitive advantage is price. Foreign-funded enterprises in China&#8217;s market share continued to decline from 2007, in order to reverse this trend, many foreign enterprises have gradually decreased fan blower prices, and <a href="http://www.allwindenergy.com/Wind_Generator.htm">wind generators manufacturer </a>domestic brands is gradually narrowing the gap. That the foreign fans before the price higher than the 20% -30% local product views are out of date, and now the price gap between 10% -20% of enterprises to China&#8217;s unprecedented fan pressure.<br />
As the fans continued to decline in price in recent years, although prices are part of the space, and machine business can be passed on to the parts cost way to temporarily ease the company, but is difficult to predict how long it can persist.<br />
Difficult to master core technologies<br />
Most of China&#8217;s wind power machine with foreign companies through joint development or purchase of the drawings the way to develop. &#8220;Standing on the shoulders of giants&#8221; may be subject to the giant, independent innovation is easier said it is hard.<br />
For example, the fan control system design has been the weak link in our fans, a larger percentage of imports, several self-developed products has yet to achieve good results. Fan control system to realize the task of not only fans of the highly automated control and power to the grid, but also must pass the appropriate control to achieve the maximum wind energy capture and load to a minimum. In addition, because wind turbines in China a growing portion of the grid, wind power generation grid compatibility problem of the poor gradually exposed and the user on the different winds, the interconnection between the different types of fans are also required higher and higher, the fan control system is also put forward new tasks.<br />
Sophisticated control system similar to this technology will become a long-term fan technology shortcomings. In addition, professionals such as<a href="http://www.allwindenergy.com/Wind_Power_Generator.htm"> wind power generators</a> , fans etc would influence the quality of China&#8217;s wind power machine business challenges, wind power machine industry will soon face the new market environment, plan ahead is essential.<br />
<h3>Related Articals</h3>
<ul class="related_post">
<li>2010年09月3日 &#8212; <a href="http://www.ahjlkj.cn/archives/564" title="North Yongji motor vehicle contracted MW doubly-fed wind power water-cooled">North Yongji motor vehicle contracted MW doubly-fed wind power water-cooled</a></li>
<li>2010年08月27日 &#8212; <a href="http://www.ahjlkj.cn/archives/557" title="Chongqing wind power will become industries Jiang New District">Chongqing wind power will become industries Jiang New District</a></li>
<li>2010年08月21日 &#8212; <a href="http://www.ahjlkj.cn/archives/551" title="Wind Power Outlook">Wind Power Outlook</a></li>
<li>2010年08月19日 &#8212; <a href="http://www.ahjlkj.cn/archives/548" title="Total installed capacity of wind power in Inner Mongolia break 10 million kilowatts">Total installed capacity of wind power in Inner Mongolia break 10 million kilowatts</a></li>
<li>2010年08月7日 &#8212; <a href="http://www.ahjlkj.cn/archives/532" title="China&#8217;s highest wind power project began lifting">China&#8217;s highest wind power project began lifting</a></li>
<li>2010年08月3日 &#8212; <a href="http://www.ahjlkj.cn/archives/528" title="Faced with great opportunities for wind power">Faced with great opportunities for wind power</a></li>
<li>2010年07月20日 &#8212; <a href="http://www.ahjlkj.cn/archives/514" title="Wind power can use wire and cable will be the focus of future development">Wind power can use wire and cable will be the focus of future development</a></li>
<li>2010年07月3日 &#8212; <a href="http://www.ahjlkj.cn/archives/501" title="Need to eliminate bottlenecks in wind power">Need to eliminate bottlenecks in wind power</a></li>
<li>2010年06月28日 &#8212; <a href="http://www.ahjlkj.cn/archives/494" title="New wind power installed capacity of 10 million kilowatts of wind power development in Europe">New wind power installed capacity of 10 million kilowatts of wind power development in Europe</a></li>
<li>2010年05月30日 &#8212; <a href="http://www.ahjlkj.cn/archives/461" title="State&#8217;s first 10 million kilowatts of wind power base and power generation started">State&#8217;s first 10 million kilowatts of wind power base and power generation started</a></li>
<li>2010年05月29日 &#8212; <a href="http://www.ahjlkj.cn/archives/457" title="Urgent need for overall planning of offshore wind power">Urgent need for overall planning of offshore wind power</a></li>
<li>2010年05月24日 &#8212; <a href="http://www.ahjlkj.cn/archives/453" title="Wind power forward in dispute">Wind power forward in dispute</a></li>
<li>2010年05月22日 &#8212; <a href="http://www.ahjlkj.cn/archives/450" title="Offshore wind power makes people feel happy and worry">Offshore wind power makes people feel happy and worry</a></li>
<li>2010年05月20日 &#8212; <a href="http://www.ahjlkj.cn/archives/447" title="On the application of wind power industry overview PLC">On the application of wind power industry overview PLC</a></li>
<li>2010年05月18日 &#8212; <a href="http://www.ahjlkj.cn/archives/442" title="World wind power equipment giant settled Da">World wind power equipment giant settled Da</a></li>
</ul>
]]></content:encoded>
			<wfw:commentRss>http://www.ahjlkj.cn/archives/516/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Wind power can use wire and cable will be the focus of future development</title>
		<link>http://www.ahjlkj.cn/archives/514</link>
		<comments>http://www.ahjlkj.cn/archives/514#comments</comments>
		<pubDate>Tue, 20 Jul 2010 09:35:25 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Wind Power News]]></category>
		<category><![CDATA[wind power]]></category>

		<guid isPermaLink="false">http://www.ahjlkj.cn/?p=514</guid>
		<description><![CDATA[With the rapid development of wind turbine, wind power generator can meet the special environmental requirements, resistance to twisting, cold resistance, salt spray, oil, UV resistant, soft, mobile features such as wind power cables will be the focus of the development of the next few years .
Stator with extra high voltage cables, round cable will [...]]]></description>
			<content:encoded><![CDATA[<p>With the rapid development of<a href="http://www.allwindenergy.com/"> wind turbine</a>, <a href="http://www.allwindenergy.com/Wind_Power_Generator.htm">wind power generator </a>can meet the special environmental requirements, resistance to twisting, cold resistance, salt spray, oil, UV resistant, soft, mobile features such as wind power cables will be the focus of the development of the next few years .</p>
<p>Stator with extra high voltage cables, round cable will replace the rectangular copper bars, can not have generators and network transformers, and thus significantly reduce the cost.</p>
<p>In accordance with the principles of optimal design, large motor stator slot is rectangular, tank coil or bar has chosen rectangular conductor of the electric field intensity distribution along the surrounding ranges, and the four corners of the Ministry of up to 9KW/mm, The four sides which has only 3KW/mm. This will result in a significant waste of insulating materials. The cable has a circular cross-section does not exist the problem, uniform electric field. Fundamentally eliminate the concentration field corner, insulation thickness of inequality and can not be thinning and so on. This reform can use the electric field from the 2.5KW/mm increased to 15KW/mm. This round cable used industrial mass production of cross-linked polyethylene insulated, low cost, while the voltage it can be up to 500KW, a number of factors affect the voltage selection, such as grid connection, local Tiaojie rules, the maximum surface wind output unit, to the site distance, the impact on the environment. Generator output voltage to the high level of the grid, no need for another step-up transformer and the network. Round for the <a href="http://www.allwindenergy.com/">wind generator</a> does not need a cable for metal shielding, though they have the same insulating material and solid extrusion technology, is popular on the market with standard items.<br />
<h3>Related Articals</h3>
<ul class="related_post">
<li>2010年09月3日 &#8212; <a href="http://www.ahjlkj.cn/archives/564" title="North Yongji motor vehicle contracted MW doubly-fed wind power water-cooled">North Yongji motor vehicle contracted MW doubly-fed wind power water-cooled</a></li>
<li>2010年08月27日 &#8212; <a href="http://www.ahjlkj.cn/archives/557" title="Chongqing wind power will become industries Jiang New District">Chongqing wind power will become industries Jiang New District</a></li>
<li>2010年08月21日 &#8212; <a href="http://www.ahjlkj.cn/archives/551" title="Wind Power Outlook">Wind Power Outlook</a></li>
<li>2010年08月19日 &#8212; <a href="http://www.ahjlkj.cn/archives/548" title="Total installed capacity of wind power in Inner Mongolia break 10 million kilowatts">Total installed capacity of wind power in Inner Mongolia break 10 million kilowatts</a></li>
<li>2010年08月7日 &#8212; <a href="http://www.ahjlkj.cn/archives/532" title="China&#8217;s highest wind power project began lifting">China&#8217;s highest wind power project began lifting</a></li>
<li>2010年08月3日 &#8212; <a href="http://www.ahjlkj.cn/archives/528" title="Faced with great opportunities for wind power">Faced with great opportunities for wind power</a></li>
<li>2010年07月23日 &#8212; <a href="http://www.ahjlkj.cn/archives/516" title="China&#8217;s wind power machine companies face four major challenges">China&#8217;s wind power machine companies face four major challenges</a></li>
<li>2010年07月3日 &#8212; <a href="http://www.ahjlkj.cn/archives/501" title="Need to eliminate bottlenecks in wind power">Need to eliminate bottlenecks in wind power</a></li>
<li>2010年06月28日 &#8212; <a href="http://www.ahjlkj.cn/archives/494" title="New wind power installed capacity of 10 million kilowatts of wind power development in Europe">New wind power installed capacity of 10 million kilowatts of wind power development in Europe</a></li>
<li>2010年05月30日 &#8212; <a href="http://www.ahjlkj.cn/archives/461" title="State&#8217;s first 10 million kilowatts of wind power base and power generation started">State&#8217;s first 10 million kilowatts of wind power base and power generation started</a></li>
<li>2010年05月29日 &#8212; <a href="http://www.ahjlkj.cn/archives/457" title="Urgent need for overall planning of offshore wind power">Urgent need for overall planning of offshore wind power</a></li>
<li>2010年05月24日 &#8212; <a href="http://www.ahjlkj.cn/archives/453" title="Wind power forward in dispute">Wind power forward in dispute</a></li>
<li>2010年05月22日 &#8212; <a href="http://www.ahjlkj.cn/archives/450" title="Offshore wind power makes people feel happy and worry">Offshore wind power makes people feel happy and worry</a></li>
<li>2010年05月20日 &#8212; <a href="http://www.ahjlkj.cn/archives/447" title="On the application of wind power industry overview PLC">On the application of wind power industry overview PLC</a></li>
<li>2010年05月18日 &#8212; <a href="http://www.ahjlkj.cn/archives/442" title="World wind power equipment giant settled Da">World wind power equipment giant settled Da</a></li>
</ul>
]]></content:encoded>
			<wfw:commentRss>http://www.ahjlkj.cn/archives/514/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Need to eliminate bottlenecks in wind power</title>
		<link>http://www.ahjlkj.cn/archives/501</link>
		<comments>http://www.ahjlkj.cn/archives/501#comments</comments>
		<pubDate>Sat, 03 Jul 2010 12:52:33 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Wind Power News]]></category>
		<category><![CDATA[wind power]]></category>

		<guid isPermaLink="false">http://www.ahjlkj.cn/?p=501</guid>
		<description><![CDATA[One side is the rising tide of new energy investments, while it is a massive clean energy grid can not be wasted; as a rich space for development of new industries in recent years has caused a lot of questions &#8230; &#8230;, experienced a growth spurt years China&#8217;s wind power generator industry, began to appear [...]]]></description>
			<content:encoded><![CDATA[<p>One side is the rising tide of new energy investments, while it is a massive clean energy grid can not be wasted; as a rich space for development of new industries in recent years has caused a lot of questions &#8230; &#8230;, experienced a growth spurt years China&#8217;s <a href="http://www.allwindenergy.com/Wind_Power_Generator.htm">wind power generator </a>industry, began to appear a lot of confusion and tangled, the development of China&#8217;s wind power is not winding path puzzle.<br />
In 2005, &#8220;Renewable Energy Law&#8221; was promulgated specifically to support wind power and other new energy industries. In the supporting policies support large-scale <a href="http://www.allwindenergy.com">wind power generator</a>s development in China started, and to cause raspberry wind speed became the world TV state.<br />
Similar to other industries, China&#8217;s wind power development can not avoid refined to have contracted the development &#8211; Governance &#8211; further development of the industry with Chinese characteristics ills. In 2009 by the ministries as wind power industries with excess capacity, the public did have to wind power is &#8220;crazy&#8221; point of view to allocating public opinion.<br />
However, wind power is really hopeless disease yet? Reporters interviewed on issues related to China&#8217;s wind power expert, honorary chairman of the China Electrotechnical Society Mr. Zhou Heliang.<br />
Zhou Heliang first attributed to the current<a href="http://www.allwindenergy.com/Small_Wind_Turbines.htm"> small wind turbines </a> development in China a few prominent contradictions:<br />
First, wind power is difficult<br />
At present wind power has become China&#8217;s wind power industry, the outstanding bottleneck. Determine the characteristics of <a href="http://www.allwindenergy.com/Wind_Power_Turbine.htm">wind power turbines </a>is difficult to maintain the stability of its load, but can not synchronize with the power load changes, there must be other wind power commitment to adapt to changes in load demands, to increase power generation capacity adjustment, peak shaving capability and storage capacity, which requires optimization of the power structure, increasing investment and operation of pumped storage units, to increase the scale of construction peaking power. &#8220;Therefore, the development of wind power development plan to enter a whole, Canada<br />
Construction of large power input. &#8221;<br />
In addition, to strengthen the research and forecast wind. Now, the country has built 400 wind towers. &#8220;But this is not enough, the research on wind energy laws should be further strengthened,&#8221; Zhou Heliang that &#8220;to build wind power prediction and forecasting system, wind power and grid companies to promote cooperation and coordination.&#8221; In addition, Zhou Heliang stressed that &#8221; countries to access power assessment, not evaluation capacity. Yinwei installed easy, and the net hard. &#8220;Once the Internet power to as targets, the State of all aspects of the unit to be an incentive to boost the enthusiasm, including the wind farm, grid companies, particular grid. &#8220;Because wind power, mainly rely on grid companies to promote.&#8221;<br />
Wind energy resource-rich areas now, most of the local grid system is small, electric load Shao, pairs of <a href="http://www.allwindenergy.com/Wind_Power.htm">wind power</a> consumption is satisfied Nenglibuzu, which Kanchuwoguo cross-network interconnection small-scale, Li Yu wind power in a larger scope Xiao Na. To solve this problem, the key is to increase the intensity of cross-network construction.<br />
Zhou Heliang that the development of wind power to the grid and network synchronization with both non-development, the formation of diversified, balanced development pattern. In the wind energy resource-rich areas, construction of wind power base, building a large network, but also small and medium sized wind farm construction according to local conditions, to meet the remote and inaccessible areas of the electricity demand.<br />
Secondly, the whole plant overcapacity<br />
At present, many domestic fans machine <a href="http://www.allwindenergy.com/Wind_Generator.htm">china wind generators  manufacturers</a>, the National Family Style electric machine assembly has been hundreds, manufacturers, and the market share of 60% of the total concentrated in the gold wind, sharp and East China gas in the hands, the three-year domestic available production enterprises with more than 2 million kW, and the remaining 40% of the market share of family property to lower the machine nearly a hundred works by intense competition.<br />
To prevent redundant construction, the Ministry of Industry in March 2010 issued a wind power equipment manufacturers access to draft standards to improve the access threshold for wind power equipment, reduce excess capacity. Meanwhile, National Grid is also studying the development of relevant technical standards and network specifications. In this regard, Zhou Heliang that reduce excess capacity should aim at capacity, more importantly, to improve equipment quality, performance, level of direction.<br />
Third, the equipment reliability issues highlighted<br />
Strong support in recent years in policy, through the introduction of technology, China has basically mastered the megawatt-class <a href="http://www.allwindenergy.com/Wind_Turbine.htm">wind turbine manufacturing</a> technology, has formed blades, gearboxes, generators and control systems and other major components of the wind power equipment industry chain, but Since most wind power company, heavy manufacturing, light innovation, re-introduction of light absorption, the key of wind power equipment and core technology subject to foreign, independent innovation capacity of wind power technology into weakness, equipment quality, especially the quality of key components Urgent increase. Coupled with the rapid development of China&#8217;s wind power industry, launched a large number of fans rushed the equipment from the research and development to the actual running time is shortened, so that lack of preparation as a result of R &amp; D fan is running a series of problems emerged.<br />
Zhou Heliang that equipment reliability issues will affect the development of large wind power in China worry that China&#8217;s wind power equipment manufacturers need to focus on wind power main and auxiliary machine optimization and matching, to improve equipment reliability to make a great effort.<br />
Fourth, public technical service system lags behind<br />
Years of wind power in the context of rapid growth, most businesses Jizhong the device Zhi Zao, Er Wind Power Industry R &amp; D platform and public services Ti Xi Ji Shu Mei You  industry is far from the pace of development of effective production, and research integrated technology R &amp; D system still in a primitive being. Zhou Heliang, said wind power industry, public technical service system is a national act, by the government to lead.<br />
In this regard, Zhou Heliang made the following recommendations: improve the standard system (including the key components and common parts), perfect quality certification system, the motor must be load test, leaves must be static and dynamic fatigue test, must be analog converter test , simulation and real load test; establishment of the South, the North Wind national test, mandatory for new fans to live life test; set up research and innovation platform &#8211; National Wind Technology Center, to accelerate the process of absorption and innovation ; learn from the Netherlands kM mode, the key components of <a href="http://www.allwindenergy.com/Wind_Power_Generator.htm">wind power generator</a> to establish national testing center; establishment of a national monitoring center fan operation time to collect wind speed, temperature fluctuations, humidity, power failure, power consumption data; establishment of a national wind energy information center, complete information statistical system, the authority for issuing notice; the full development of wind power professionals, including wind power design, process and installation, commissioning, operation and management personnel at all levels of technology development, management, operations and senior skilled workers to address the talent shortage of wind power.<br />
Fifth, the wind power technical services required to develop<br />
&#8220;We now have a wind power industry, the obvious question, is the <a href="http://www.allwindenergy.com">wind generators </a>farm&#8217;s operation and management level is too low, mostly attention to wind power installed capacity building, the expense of running.&#8221; Zhou Heliang visited a number of wind farms, he found &#8220;To maintain, repair capability, or maintenance, management capabilities are not keep up.&#8221;<br />
Zhou Heliang recommended to explore the formation of professional and technical services operation of wind power company, the establishment of regional wind power plant and wind farm maintenance parts library, the development of modern wind power technology services. This is similar to the field of real estate property management, specifically with professional property management companies provide the owners with a full range of social service.<br />
Sixth, be careful to promote offshore wind power<br />
Now, offshore wind power is becoming a new favorite in the field of wind power in China. Although offshore wind power with wind energy resources are very stable and do not take up land resources, the advantages of minimal environmental impact. However, compared to land-based wind power, the offshore wind farm building is not only large investment and high technical difficulty, but also faces the sea ice, a series of typhoons and the risks of uncontrollable factors.<br />
&#8220;China&#8217;s first offshore wind development on the face of technology, equipment and project development experience, reliability constraints,&#8221; said Zhou Heliang develop offshore wind power in China, or novice, need to be treated with caution. In the conditions allow, you can give priority to the development from the load center near offshore wind resource conditions are particularly good demonstration project. At the same time, once decided to develop, enhance the development of an appropriate scale should be possible, using the country&#8217;s most mature technology and equipment. Offshore wind power investment is 2.5 times the land wind, and offshore wind power equipment maintenance costs high, thus requiring offshore wind power machine equipment must have high reliability to be guaranteed.<br />
Zhou Heliang emphasized that <a href="http://www.allwindenergy.com/Windmill_Power.htm">windmill power </a>as a new industry, will inevitably have some problems, but this is the industrial development process itself, the problem is the way forward in the conflict, because these problems must not be unworthy, the negative role in development of wind power and significance.<br />
Zhou Heliang analysis, wind power industry also need 3 to 5 years to enter into maturity. Mature stage was marked by conflicts over access to basic solution, there is no obvious contradiction. &#8220;Another important indicator of the mature stage is a fan run time can be in more than 2000h,&#8221; Zhou Heliang, the &#8220;wind farm in the country is now about 1 / 4 of the wind turbine is idle, the utilization rate of less than ideal requirements. according to several typical wind farm is estimated that annual operating at 1800h fans around, only profit, loss of wind power can not always, or else there would be no development potential. &#8221;<br />
&#8220;These are all a process, these five years, we have solved MW of wind power the problem from scratch,&#8221; Zhou Heliang finally stressed that &#8220;the next stage, we will address the optimization of<a href="http://www.allwindenergy.com/Wind_Power_Turbine.htm"> wind power turbines </a>development. As long as we gradually and steady development of wind power, to avoid big ups and downs, wind power industry will weather a new strategy to achieving the national goal of energy saving a major force.<br />
<h3>Related Articals</h3>
<ul class="related_post">
<li>2010年09月3日 &#8212; <a href="http://www.ahjlkj.cn/archives/564" title="North Yongji motor vehicle contracted MW doubly-fed wind power water-cooled">North Yongji motor vehicle contracted MW doubly-fed wind power water-cooled</a></li>
<li>2010年08月27日 &#8212; <a href="http://www.ahjlkj.cn/archives/557" title="Chongqing wind power will become industries Jiang New District">Chongqing wind power will become industries Jiang New District</a></li>
<li>2010年08月21日 &#8212; <a href="http://www.ahjlkj.cn/archives/551" title="Wind Power Outlook">Wind Power Outlook</a></li>
<li>2010年08月19日 &#8212; <a href="http://www.ahjlkj.cn/archives/548" title="Total installed capacity of wind power in Inner Mongolia break 10 million kilowatts">Total installed capacity of wind power in Inner Mongolia break 10 million kilowatts</a></li>
<li>2010年08月7日 &#8212; <a href="http://www.ahjlkj.cn/archives/532" title="China&#8217;s highest wind power project began lifting">China&#8217;s highest wind power project began lifting</a></li>
<li>2010年08月3日 &#8212; <a href="http://www.ahjlkj.cn/archives/528" title="Faced with great opportunities for wind power">Faced with great opportunities for wind power</a></li>
<li>2010年07月23日 &#8212; <a href="http://www.ahjlkj.cn/archives/516" title="China&#8217;s wind power machine companies face four major challenges">China&#8217;s wind power machine companies face four major challenges</a></li>
<li>2010年07月20日 &#8212; <a href="http://www.ahjlkj.cn/archives/514" title="Wind power can use wire and cable will be the focus of future development">Wind power can use wire and cable will be the focus of future development</a></li>
<li>2010年06月28日 &#8212; <a href="http://www.ahjlkj.cn/archives/494" title="New wind power installed capacity of 10 million kilowatts of wind power development in Europe">New wind power installed capacity of 10 million kilowatts of wind power development in Europe</a></li>
<li>2010年05月30日 &#8212; <a href="http://www.ahjlkj.cn/archives/461" title="State&#8217;s first 10 million kilowatts of wind power base and power generation started">State&#8217;s first 10 million kilowatts of wind power base and power generation started</a></li>
<li>2010年05月29日 &#8212; <a href="http://www.ahjlkj.cn/archives/457" title="Urgent need for overall planning of offshore wind power">Urgent need for overall planning of offshore wind power</a></li>
<li>2010年05月24日 &#8212; <a href="http://www.ahjlkj.cn/archives/453" title="Wind power forward in dispute">Wind power forward in dispute</a></li>
<li>2010年05月22日 &#8212; <a href="http://www.ahjlkj.cn/archives/450" title="Offshore wind power makes people feel happy and worry">Offshore wind power makes people feel happy and worry</a></li>
<li>2010年05月20日 &#8212; <a href="http://www.ahjlkj.cn/archives/447" title="On the application of wind power industry overview PLC">On the application of wind power industry overview PLC</a></li>
<li>2010年05月18日 &#8212; <a href="http://www.ahjlkj.cn/archives/442" title="World wind power equipment giant settled Da">World wind power equipment giant settled Da</a></li>
</ul>
]]></content:encoded>
			<wfw:commentRss>http://www.ahjlkj.cn/archives/501/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>New wind power installed capacity of 10 million kilowatts of wind power development in Europe</title>
		<link>http://www.ahjlkj.cn/archives/494</link>
		<comments>http://www.ahjlkj.cn/archives/494#comments</comments>
		<pubDate>Mon, 28 Jun 2010 15:05:27 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Wind Power News]]></category>
		<category><![CDATA[wind power]]></category>

		<guid isPermaLink="false">http://www.ahjlkj.cn/?p=494</guid>
		<description><![CDATA[European Wind Energy Association, 14, CEO of Shell, said at a news conference, the European year of wind power generator  installed capacity will add 10 million kilowatts, the second consecutive year to achieve the growth rate of 10 million kilowatts.
Europe last year, completed a record amount of wind turbines installed capacity of 10.16 million [...]]]></description>
			<content:encoded><![CDATA[<p>European Wind Energy Association, 14, CEO of Shell, said at a news conference, the European year of <a href="http://www.allwindenergy.com/Wind_Power_Generator.htm">wind power generator </a> installed capacity will add 10 million kilowatts, the second consecutive year to achieve the growth rate of 10 million kilowatts.<br />
Europe last year, completed a record amount of <a href="http://www.allwindenergy.com">wind turbines </a>installed capacity of 10.16 million kilowatts, the total wind power capacity reached 74.77 million kilowatts, will reach 85 million kilowatts this year, an increase of 13%.<br />
Shell said the results are encouraging, indicating Although Europe is now suffering serious financial and economic crisis, investors remained confident that the wind power industry. He said the development of the European wind power industry is characterized by significant increase in the marine offshore installed capacity will reach 1 million kilowatts, much higher than last year&#8217;s nearly 58 million kilowatts.<br />
Europe is the world leading position in the field of <a href="http://www.allwindenergy.com/Wind_Power_Generator.htm">wind power generators</a>. In 2008, global wind power equipment turnover of 36 billion euros, European manufacturers account for 60% of the share. European Wind Energy Association expects total installed capacity of wind power in Europe will be further significant increase in 2020, when the European electricity market can meet the needs of 14% to 17%.<br />
15, the world&#8217;s wind energy, the European Wind Energy Association will be held in 26 countries, 198 events. Currently, more than 60 countries of the Association has 650 members, holds the world&#8217;s wind power equipment market share of 90%.<br />
<h3>Related Articals</h3>
<ul class="related_post">
<li>2010年09月3日 &#8212; <a href="http://www.ahjlkj.cn/archives/564" title="North Yongji motor vehicle contracted MW doubly-fed wind power water-cooled">North Yongji motor vehicle contracted MW doubly-fed wind power water-cooled</a></li>
<li>2010年08月27日 &#8212; <a href="http://www.ahjlkj.cn/archives/557" title="Chongqing wind power will become industries Jiang New District">Chongqing wind power will become industries Jiang New District</a></li>
<li>2010年08月21日 &#8212; <a href="http://www.ahjlkj.cn/archives/551" title="Wind Power Outlook">Wind Power Outlook</a></li>
<li>2010年08月19日 &#8212; <a href="http://www.ahjlkj.cn/archives/548" title="Total installed capacity of wind power in Inner Mongolia break 10 million kilowatts">Total installed capacity of wind power in Inner Mongolia break 10 million kilowatts</a></li>
<li>2010年08月7日 &#8212; <a href="http://www.ahjlkj.cn/archives/532" title="China&#8217;s highest wind power project began lifting">China&#8217;s highest wind power project began lifting</a></li>
<li>2010年08月3日 &#8212; <a href="http://www.ahjlkj.cn/archives/528" title="Faced with great opportunities for wind power">Faced with great opportunities for wind power</a></li>
<li>2010年07月23日 &#8212; <a href="http://www.ahjlkj.cn/archives/516" title="China&#8217;s wind power machine companies face four major challenges">China&#8217;s wind power machine companies face four major challenges</a></li>
<li>2010年07月20日 &#8212; <a href="http://www.ahjlkj.cn/archives/514" title="Wind power can use wire and cable will be the focus of future development">Wind power can use wire and cable will be the focus of future development</a></li>
<li>2010年07月3日 &#8212; <a href="http://www.ahjlkj.cn/archives/501" title="Need to eliminate bottlenecks in wind power">Need to eliminate bottlenecks in wind power</a></li>
<li>2010年05月30日 &#8212; <a href="http://www.ahjlkj.cn/archives/461" title="State&#8217;s first 10 million kilowatts of wind power base and power generation started">State&#8217;s first 10 million kilowatts of wind power base and power generation started</a></li>
<li>2010年05月29日 &#8212; <a href="http://www.ahjlkj.cn/archives/457" title="Urgent need for overall planning of offshore wind power">Urgent need for overall planning of offshore wind power</a></li>
<li>2010年05月24日 &#8212; <a href="http://www.ahjlkj.cn/archives/453" title="Wind power forward in dispute">Wind power forward in dispute</a></li>
<li>2010年05月22日 &#8212; <a href="http://www.ahjlkj.cn/archives/450" title="Offshore wind power makes people feel happy and worry">Offshore wind power makes people feel happy and worry</a></li>
<li>2010年05月20日 &#8212; <a href="http://www.ahjlkj.cn/archives/447" title="On the application of wind power industry overview PLC">On the application of wind power industry overview PLC</a></li>
<li>2010年05月18日 &#8212; <a href="http://www.ahjlkj.cn/archives/442" title="World wind power equipment giant settled Da">World wind power equipment giant settled Da</a></li>
</ul>
]]></content:encoded>
			<wfw:commentRss>http://www.ahjlkj.cn/archives/494/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
