﻿<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Wind Power,Wind Turbine Manufacturer &#187; Wind farm</title>
	<atom:link href="http://www.ahjlkj.cn/archives/tag/wind-farm/feed" rel="self" type="application/rss+xml" />
	<link>http://www.ahjlkj.cn</link>
	<description>Professional Wind Turbine、Windmill Power、Wind Power Generators in China</description>
	<lastBuildDate>Thu, 02 Feb 2012 12:54:27 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.1</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>He Landa door Shipyard for offshore wind farm</title>
		<link>http://www.ahjlkj.cn/archives/815</link>
		<comments>http://www.ahjlkj.cn/archives/815#comments</comments>
		<pubDate>Fri, 15 Apr 2011 14:52:51 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Wind Power News]]></category>
		<category><![CDATA[Wind farm]]></category>

		<guid isPermaLink="false">http://www.ahjlkj.cn/?p=815</guid>
		<description><![CDATA[Recently, He Landa door Shipyard Group said, now that the offshore wind farm in the shipyard for the construction of the first one pair of axes bow catamaran has entered the final stage.
He Landa door Shipyard Group believes that the 2610 high-speed support vessels aboard the last decade, the company ships the most innovative design [...]]]></description>
			<content:encoded><![CDATA[<p>Recently, He Landa door Shipyard Group said, now that the offshore wind farm in the shipyard for the construction of the first one pair of axes bow catamaran has entered the final stage.</p>
<p>He Landa door Shipyard Group believes that the 2610 high-speed support vessels aboard the last decade, the company ships the most innovative design concepts.</p>
<p>Five years ago, He Landa door Shipyard Group has successfully introduced the concept of double ax bow. Has now delivered 25 ocean ax monohulls (Sea Axe monohull), but also 22 under construction.</p>
<p>Double ax, bow catamaran in within 24 meters of the load line with a more stable platform. With the same displacement of traditional catamarans, the new vessels can reduce the peak acceleration of the concept of 75%, 15% of calm water resistance and wave resistance can be reduced an additional 60%.</p>
<p>2610 high-speed support vessels first ship will be June 14-16 at the 2011 Southampton <a href="http://www.allwindenergy.com/Wind_Turbine_Generator.htm">wind turbine generator </a>marine exhibits. May the ship will be based on the actual forecasts and model test program to test economic indicators.</p>
<p>2610 high-speed support vessels first ship design features are:</p>
<p>Boat fenders before the system can withstand the speed of more than 3 would not lead to structural damage to the ship&#8217;s speed; can be aft steering room / accommodation to minimize the acceleration; as to minimize noise in the wheelhouse, the flexibility installation; do not overload the engine speed of zero, the two gearbox allows maximum bollard pull; two large cargo deck 20-foot containers (maximum 15 tons); stern set dive / rescue platform; the user a high degree of such as the cellar deck and additional <a href="http://www.allwindenergy.com/Wind_Generator.htm">wind generator manufacturers</a> accommodation; customers to choose the transmission of fuel; fuel tank decorated with a ship from bow to stern; endurance wide; three-point mooring system.</p>
<h3  class="related_post_title">Related Articals</h3><ul class="related_post"><li>2011年03月2日 -- <a href="http://www.ahjlkj.cn/archives/774" title="Ningbo will add 4.5 million kilowatts wind farm  for the next year">Ningbo will add 4.5 million kilowatts wind farm  for the next year</a></li><li>2011年02月14日 -- <a href="http://www.ahjlkj.cn/archives/754" title="SuSiLan will build wind farm in wales state  ">SuSiLan will build wind farm in wales state  </a></li><li>2011年01月9日 -- <a href="http://www.ahjlkj.cn/archives/713" title="Heilongjiang province will be built 10 million kilowatts wind farm">Heilongjiang province will be built 10 million kilowatts wind farm</a></li><li>2010年11月22日 -- <a href="http://www.ahjlkj.cn/archives/652" title="The first 93 Earth Wind Farm turbines and power generation">The first 93 Earth Wind Farm turbines and power generation</a></li><li>2010年05月8日 -- <a href="http://www.ahjlkj.cn/archives/433" title="America&#8217;s first offshore wind farm approved">America&#8217;s first offshore wind farm approved</a></li><li>2009年07月24日 -- <a href="http://www.ahjlkj.cn/archives/146" title="From coal mine to wind farm">From coal mine to wind farm</a></li><li>2009年06月18日 -- <a href="http://www.ahjlkj.cn/archives/116" title="Wind farm proposed for Cape military reservation">Wind farm proposed for Cape military reservation</a></li></ul>]]></content:encoded>
			<wfw:commentRss>http://www.ahjlkj.cn/archives/815/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Ningbo will add 4.5 million kilowatts wind farm  for the next year</title>
		<link>http://www.ahjlkj.cn/archives/774</link>
		<comments>http://www.ahjlkj.cn/archives/774#comments</comments>
		<pubDate>Wed, 02 Mar 2011 13:45:24 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Wind Power News]]></category>
		<category><![CDATA[Wind farm]]></category>

		<guid isPermaLink="false">http://www.ahjlkj.cn/?p=774</guid>
		<description><![CDATA[Eve, zhejiang thermal power construction company and guodian ningbo wind power development Co., LTD. Has signed &#8220;in hangzhou, ningbo wear mountain wind engineering construction and installation construction general contract&#8221;, zhejiang will add 450 million kilowatts total installed scale of jie neng power supply.
Learned, ningbo, zhejiang province wear mountain wind power.at the project is located with [...]]]></description>
			<content:encoded><![CDATA[<p>Eve, zhejiang thermal power construction company and guodian ningbo wind power development Co., LTD. Has signed &#8220;in hangzhou, ningbo wear mountain wind engineering construction and installation construction general contract&#8221;, zhejiang will add 450 million kilowatts total installed scale of jie neng power supply.<br />
Learned, ningbo, zhejiang province wear mountain <a href="http://www.allwindenergy.com/Wind_Power.htm">wind power</a>.at the project is located with wear mountain peninsula coastal midline edom, sunlit baiyang line north, white midline south mountain area. The project includes booster fan, standing and power lines, total installed capacity of 30 Taiwan mono-device 1500 kw, the <a href="http://www.allwindenergy.com/">wind generator</a> synchronization in south BaiFeng changed 220 kv pressor stood a newly-built 110 kv and production and living facilities, 30 sets fan to boost the 35 kv line stand about 2.46 km, general pressor stand to guo change of 110 kv temporary lines long approximately 1.5 km, with a total land area of 19615 square meters, with a total investment of about 5 billion yuan by the end of 2012, plans to put into production. At present, the project is the preparatory work already under way.</p>
<h3  class="related_post_title">Related Articals</h3><ul class="related_post"><li>2011年04月15日 -- <a href="http://www.ahjlkj.cn/archives/815" title="He Landa door Shipyard for offshore wind farm">He Landa door Shipyard for offshore wind farm</a></li><li>2011年02月14日 -- <a href="http://www.ahjlkj.cn/archives/754" title="SuSiLan will build wind farm in wales state  ">SuSiLan will build wind farm in wales state  </a></li><li>2011年01月9日 -- <a href="http://www.ahjlkj.cn/archives/713" title="Heilongjiang province will be built 10 million kilowatts wind farm">Heilongjiang province will be built 10 million kilowatts wind farm</a></li><li>2010年11月22日 -- <a href="http://www.ahjlkj.cn/archives/652" title="The first 93 Earth Wind Farm turbines and power generation">The first 93 Earth Wind Farm turbines and power generation</a></li><li>2010年05月8日 -- <a href="http://www.ahjlkj.cn/archives/433" title="America&#8217;s first offshore wind farm approved">America&#8217;s first offshore wind farm approved</a></li><li>2009年07月24日 -- <a href="http://www.ahjlkj.cn/archives/146" title="From coal mine to wind farm">From coal mine to wind farm</a></li><li>2009年06月18日 -- <a href="http://www.ahjlkj.cn/archives/116" title="Wind farm proposed for Cape military reservation">Wind farm proposed for Cape military reservation</a></li></ul>]]></content:encoded>
			<wfw:commentRss>http://www.ahjlkj.cn/archives/774/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>SuSiLan will build wind farm in wales state</title>
		<link>http://www.ahjlkj.cn/archives/754</link>
		<comments>http://www.ahjlkj.cn/archives/754#comments</comments>
		<pubDate>Mon, 14 Feb 2011 14:28:47 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Wind Power News]]></category>
		<category><![CDATA[Wind farm]]></category>

		<guid isPermaLink="false">http://www.ahjlkj.cn/?p=754</guid>
		<description><![CDATA[The world&#8217;s third largest producer in Australia SuSiLan plan fan NSW investment 3.9 billion to build a windmill generator farm.
According to Australia&#8217;s environment minister site on the material, the wind farm in the gulag, near distance than about 220 kilometers southwest of Sydney, is expected to put into operation in 2014. The wind will likely [...]]]></description>
			<content:encoded><![CDATA[<p>The world&#8217;s third largest producer in Australia SuSiLan plan fan NSW investment 3.9 billion to build a<a href="http://www.allwindenergy.com/Windmill_Generators.htm"> windmill generator</a> farm.</p>
<p>According to Australia&#8217;s environment minister site on the material, the wind farm in the gulag, near distance than about 220 kilometers southwest of Sydney, is expected to put into operation in 2014. The wind will likely in the middle of next year open built.<br />
Australia is the world&#8217;s largest coal exporter, goal is by 2020 renewable power generation reached 20%. Australian prime minister gillard says lawmakers must decide this year as coal burning in such fossil fuel taxes way to combat climate change.</p>
<p>AGL (astronet graphic library) energy company is Australia electric power retailers last year, and New Zealand Meridian energy cooperation company agreed to in Victoria saw an installed capacity for 420MW engineering. They predict this will be the biggest <a href="http://www.allwindenergy.com/Wind_Turbine_Generator.htm">wind turbine generator</a> .at the southern hemisphere.</p>
<p>According to the data from new south wales, the SuSiLan <a href="http://www.allwindenergy.com/">wind turbines manufacturers</a> that will bring the 150 jobs.</p>
<p>SuSiLan company website shows, SuSiLan in Australia has won more than 20 billion contract to provide more than 750MW clean energy power.</p>
<h3  class="related_post_title">Related Articals</h3><ul class="related_post"><li>2011年04月15日 -- <a href="http://www.ahjlkj.cn/archives/815" title="He Landa door Shipyard for offshore wind farm">He Landa door Shipyard for offshore wind farm</a></li><li>2011年03月2日 -- <a href="http://www.ahjlkj.cn/archives/774" title="Ningbo will add 4.5 million kilowatts wind farm  for the next year">Ningbo will add 4.5 million kilowatts wind farm  for the next year</a></li><li>2011年01月9日 -- <a href="http://www.ahjlkj.cn/archives/713" title="Heilongjiang province will be built 10 million kilowatts wind farm">Heilongjiang province will be built 10 million kilowatts wind farm</a></li><li>2010年11月22日 -- <a href="http://www.ahjlkj.cn/archives/652" title="The first 93 Earth Wind Farm turbines and power generation">The first 93 Earth Wind Farm turbines and power generation</a></li><li>2010年05月8日 -- <a href="http://www.ahjlkj.cn/archives/433" title="America&#8217;s first offshore wind farm approved">America&#8217;s first offshore wind farm approved</a></li><li>2009年07月24日 -- <a href="http://www.ahjlkj.cn/archives/146" title="From coal mine to wind farm">From coal mine to wind farm</a></li><li>2009年06月18日 -- <a href="http://www.ahjlkj.cn/archives/116" title="Wind farm proposed for Cape military reservation">Wind farm proposed for Cape military reservation</a></li></ul>]]></content:encoded>
			<wfw:commentRss>http://www.ahjlkj.cn/archives/754/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Heilongjiang province will be built 10 million kilowatts wind farm</title>
		<link>http://www.ahjlkj.cn/archives/713</link>
		<comments>http://www.ahjlkj.cn/archives/713#comments</comments>
		<pubDate>Sun, 09 Jan 2011 14:35:27 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Wind Power News]]></category>
		<category><![CDATA[Wind farm]]></category>

		<guid isPermaLink="false">http://www.ahjlkj.cn/archives/713</guid>
		<description><![CDATA[China datang new energy company and heilongjiang are up technology company signed a contract that will build on August 10 million kilowatts wind farm. Deputy provincial ChangSunYao attended the signing ceremony.
At the signing ceremony on the reporter learns, wind turbines farm is located in JiJiHaErShi, plan in August, was built on October has been formally [...]]]></description>
			<content:encoded><![CDATA[<p>China datang new energy company and heilongjiang are up technology company signed a contract that will build on August 10 million kilowatts wind farm. Deputy provincial ChangSunYao attended the signing ceremony.</p>
<p>At the signing ceremony on the reporter learns, <a href="http://www.allwindenergy.com">wind turbines</a> farm is located in JiJiHaErShi, plan in August, was built on October has been formally put into production. After the completion of the station to ease tensions province energy will play a positive role. Meanwhile, relevant departments are of Harbin on wind investigation, if conditions mature, Harbin will also owns a large wind farm.</p>
<h3  class="related_post_title">Related Articals</h3><ul class="related_post"><li>2011年04月15日 -- <a href="http://www.ahjlkj.cn/archives/815" title="He Landa door Shipyard for offshore wind farm">He Landa door Shipyard for offshore wind farm</a></li><li>2011年03月2日 -- <a href="http://www.ahjlkj.cn/archives/774" title="Ningbo will add 4.5 million kilowatts wind farm  for the next year">Ningbo will add 4.5 million kilowatts wind farm  for the next year</a></li><li>2011年02月14日 -- <a href="http://www.ahjlkj.cn/archives/754" title="SuSiLan will build wind farm in wales state  ">SuSiLan will build wind farm in wales state  </a></li><li>2010年11月22日 -- <a href="http://www.ahjlkj.cn/archives/652" title="The first 93 Earth Wind Farm turbines and power generation">The first 93 Earth Wind Farm turbines and power generation</a></li><li>2010年05月8日 -- <a href="http://www.ahjlkj.cn/archives/433" title="America&#8217;s first offshore wind farm approved">America&#8217;s first offshore wind farm approved</a></li><li>2009年07月24日 -- <a href="http://www.ahjlkj.cn/archives/146" title="From coal mine to wind farm">From coal mine to wind farm</a></li><li>2009年06月18日 -- <a href="http://www.ahjlkj.cn/archives/116" title="Wind farm proposed for Cape military reservation">Wind farm proposed for Cape military reservation</a></li></ul>]]></content:encoded>
			<wfw:commentRss>http://www.ahjlkj.cn/archives/713/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>The first 93 Earth Wind Farm turbines and power generation</title>
		<link>http://www.ahjlkj.cn/archives/652</link>
		<comments>http://www.ahjlkj.cn/archives/652#comments</comments>
		<pubDate>Mon, 22 Nov 2010 13:55:34 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Wind Power News]]></category>
		<category><![CDATA[Wind farm]]></category>

		<guid isPermaLink="false">http://www.ahjlkj.cn/?p=652</guid>
		<description><![CDATA[The soil in the town of Laizhou Bay, 93 wind turbines arranged in a patchwork with the coastline has become a beautiful landscape.
It is understood, located in Datang Town, Laizhou Laizhou soil wind power generators projects and Eastern Yantai Laizhou Wind Power Project a total investment of 20 billion yuan, has been under construction since [...]]]></description>
			<content:encoded><![CDATA[<p>The soil in the town of Laizhou Bay, 93 <a href="http://www.allwindenergy.com/">wind turbines</a> arranged in a patchwork with the coastline has become a beautiful landscape.</p>
<p>It is understood, located in Datang Town, Laizhou Laizhou soil <a href="http://www.allwindenergy.com/Wind_Power_Generator.htm">wind power generators</a> projects and Eastern Yantai Laizhou Wind Power Project a total investment of 20 billion yuan, has been under construction since the project, soil Town continue to enhance service and concentrate on promoting the project to speed up construction. Early work has been invested in the current 1.3 billion, the first of 93 turbines and<a href="http://www.allwindenergy.com/Wind_Power_Generation.htm"> wind power generation </a>has been achieved. On 1 &#8212; October 2010 completed a total generating capacity of 200 million kwh, coal saving 90,000 tons per year, saving 19 million tons, 200 tons of sulfur dioxide emissions, 500 tons of nitrogen oxide, effectively improved the local power structure and reduce environmental pollution music, to achieve economic efficiency and environmental protection &#8220;double harvest.&#8221;<a href="http://www.ahjlkj.cn/wp-content/uploads/2010/11/7A134B21654444AFF2699D66A6FBF181.jpg"><img class="aligncenter size-full wp-image-653" src="http://www.ahjlkj.cn/wp-content/uploads/2010/11/7A134B21654444AFF2699D66A6FBF181.jpg" alt="The first 93 Earth Wind Farm turbines and power generation" width="400" height="246" /></a></p>
<p>Learned about 5.6 billion investment Datang Laizhou Wind Farm Phase III is stepping up offshore wind farm projects in the construction of the building, the current installed capacity for the project 49.5MW, installation of 33 sets of unit capacity of 1500KW land-based <a href="http://www.allwindenergy.com/Small_Wind_Turbines.htm">small wind turbine</a>, at the end of 24 units installed before the expected</p>
<h3  class="related_post_title">Related Articals</h3><ul class="related_post"><li>2011年04月15日 -- <a href="http://www.ahjlkj.cn/archives/815" title="He Landa door Shipyard for offshore wind farm">He Landa door Shipyard for offshore wind farm</a></li><li>2011年03月2日 -- <a href="http://www.ahjlkj.cn/archives/774" title="Ningbo will add 4.5 million kilowatts wind farm  for the next year">Ningbo will add 4.5 million kilowatts wind farm  for the next year</a></li><li>2011年02月14日 -- <a href="http://www.ahjlkj.cn/archives/754" title="SuSiLan will build wind farm in wales state  ">SuSiLan will build wind farm in wales state  </a></li><li>2011年01月9日 -- <a href="http://www.ahjlkj.cn/archives/713" title="Heilongjiang province will be built 10 million kilowatts wind farm">Heilongjiang province will be built 10 million kilowatts wind farm</a></li><li>2010年05月8日 -- <a href="http://www.ahjlkj.cn/archives/433" title="America&#8217;s first offshore wind farm approved">America&#8217;s first offshore wind farm approved</a></li><li>2009年07月24日 -- <a href="http://www.ahjlkj.cn/archives/146" title="From coal mine to wind farm">From coal mine to wind farm</a></li><li>2009年06月18日 -- <a href="http://www.ahjlkj.cn/archives/116" title="Wind farm proposed for Cape military reservation">Wind farm proposed for Cape military reservation</a></li></ul>]]></content:encoded>
			<wfw:commentRss>http://www.ahjlkj.cn/archives/652/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>America&#8217;s first offshore wind farm approved</title>
		<link>http://www.ahjlkj.cn/archives/433</link>
		<comments>http://www.ahjlkj.cn/archives/433#comments</comments>
		<pubDate>Sat, 08 May 2010 08:24:06 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Wind Power News]]></category>
		<category><![CDATA[Wind farm]]></category>

		<guid isPermaLink="false">http://www.ahjlkj.cn/?p=433</guid>
		<description><![CDATA[Department of the Interior has approved the &#8220;Cape Wind&#8221; (Cape Wind) project, as the nation&#8217;s first offshore wind farm construction paved the way for.
&#8220;Cape Wind&#8221; project has long been in a pickle. Years, residents of Massachusetts, Cape region, Indian tribes, politicians struggle with the ongoing project developers.
Interior, Ken Sala Charles (Ken Salazar) 4 月 28 [...]]]></description>
			<content:encoded><![CDATA[<p>Department of the Interior has approved the &#8220;Cape Wind&#8221; (Cape Wind) project, as the nation&#8217;s first offshore wind farm construction paved the way for.</p>
<p>&#8220;Cape Wind&#8221; project has long been in a pickle. Years, residents of Massachusetts, Cape region, Indian tribes, politicians struggle with the ongoing project developers.</p>
<p>Interior, Ken Sala Charles (Ken Salazar) 4 月 28 announced a project approved the decision. Salazar said: &#8220;In the long process of assessment and consultation, after careful consideration of all parties concerned, an overall analysis of the factors involved in the project, we think we should respect the public interest, approval of &#8216;Cape Wind&#8217; project. We energy future for the United States to open up a new direction, Kai build the nation&#8217;s first offshore wind power generation facilities, opening a new chapter in the history of the region. &#8221;</p>
<p>United States, the first offshore wind farm Controversy</p>
<p>Salazar also pointed out that &#8220;Cape Wind&#8221; project size from 170 wind turbines, reduced to 130, was imposed special requirements needed to conduct archaeological research on the coast, to ensure that locally important protected areas. <a href="http://www.allwindenergy.com/">Wind turbines </a>is to reduce the number of compression on the local Historic Landmark and the nearby islands of. The project is expected to Massachusetts residents of 180 megawatts of electricity to meet demand for electricity 75% of households.</p>
<p>Once the seabed to identify potential cultural and historic resources, developers need to stop the operation, and any unexpected archaeological discovery to notify the Government. Salazar said: &#8220;The project will minimize the impact of historical features, the project&#8217;s construction, operation and decommissioning, we will ensure that cultural resources are not damaged.&#8221;</p>
<p>Salazar said the governor&#8217;s letter northeast coastal states played an important impact on the approval decision. Governors said, according to previous recommendations of the federal review team history, all over the east coast most of the proposed <a href="http://www.allwindenergy.com/">wind generators </a>project will not continue.</p>
<p>&#8220;Christian Science Monitor&#8221; says Europe&#8217;s offshore wind farm scale, the United States lags far behind. Massachusetts Governor Deval Patrick (Deval Patrick) of the Ministry of the Interior United States welcomed the decision. In his view, the decision is of great significance, for the offshore wind power industry in the United States paved the way for the development.</p>
<p>Some energy industry analysts agreed. Wind energy industry analyst  (Matt Kaplan) said: &#8220;This is the offshore wind industry, symbolic step. &#8216;Cape Wind&#8217; project has become the pioneer of offshore wind power. The project will mark the completion of of a new industry in the U.S. Open. &#8221;</p>
<p>But the Cape region Masha elegant island (Martha&#8217;&#8217;s Vineyard) after an Indian tribe, said Ministry of the Interior to approve the project if the United States would Salazar litigation. The tribe said the wind turbines on their &#8220;holy&#8221; cause a disturbance. Others have also expressed opposition. Protection of Nantucket Island Strait Alliance spokesman Padidining (Patty Dineen) said: &#8220;We will definitely take legal action.&#8221;</p>
<p>Salazar said the Ministry of the Interior&#8217;s decision was based on nine years of environmental and other assessments, he is convinced that the decision will be supported in court.</p>
<p>Great potential for offshore wind power</p>
<p>U.S. National Renewable Energy Laboratory (National Renewable Energy Laboratory) has estimated U.S. offshore region alone could generate 90,000 megawatts of electricity. A Department of Energy found that wind energy could provide 20% of U.S. electricity, up to 30 megawatts, of which about one-sixth of the wind from the sea.</p>
<p>Environmentalists say, &#8220;Cape Wind&#8221; project was approved in the United States in response to global warming, a major step forward on the road, this will enable <a href="http://www.allwindenergy.com/Wind_Energy.htm">wind energy</a> to replace fossil fuel-based energy.</p>
<h3  class="related_post_title">Related Articals</h3><ul class="related_post"><li>2011年04月15日 -- <a href="http://www.ahjlkj.cn/archives/815" title="He Landa door Shipyard for offshore wind farm">He Landa door Shipyard for offshore wind farm</a></li><li>2011年03月2日 -- <a href="http://www.ahjlkj.cn/archives/774" title="Ningbo will add 4.5 million kilowatts wind farm  for the next year">Ningbo will add 4.5 million kilowatts wind farm  for the next year</a></li><li>2011年02月14日 -- <a href="http://www.ahjlkj.cn/archives/754" title="SuSiLan will build wind farm in wales state  ">SuSiLan will build wind farm in wales state  </a></li><li>2011年01月9日 -- <a href="http://www.ahjlkj.cn/archives/713" title="Heilongjiang province will be built 10 million kilowatts wind farm">Heilongjiang province will be built 10 million kilowatts wind farm</a></li><li>2010年11月22日 -- <a href="http://www.ahjlkj.cn/archives/652" title="The first 93 Earth Wind Farm turbines and power generation">The first 93 Earth Wind Farm turbines and power generation</a></li><li>2009年07月24日 -- <a href="http://www.ahjlkj.cn/archives/146" title="From coal mine to wind farm">From coal mine to wind farm</a></li><li>2009年06月18日 -- <a href="http://www.ahjlkj.cn/archives/116" title="Wind farm proposed for Cape military reservation">Wind farm proposed for Cape military reservation</a></li></ul>]]></content:encoded>
			<wfw:commentRss>http://www.ahjlkj.cn/archives/433/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>From coal mine to wind farm</title>
		<link>http://www.ahjlkj.cn/archives/146</link>
		<comments>http://www.ahjlkj.cn/archives/146#comments</comments>
		<pubDate>Fri, 24 Jul 2009 15:05:50 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Wind Power Knowledge]]></category>
		<category><![CDATA[Wind farm]]></category>

		<guid isPermaLink="false">http://www.ahjlkj.cn/?p=146</guid>
		<description><![CDATA[Walking across the former site of the Dave Johnston Mine here, about half an  hour outside Casper, you&#8217;d never know that over the course of 42 years, 104  million tons of coal was taken out of the ground.
But now, instead of having a heavy carbon footprint&#8211;and coal certainly  does&#8211;these rolling hills have [...]]]></description>
			<content:encoded><![CDATA[<p>Walking across the former site of the Dave Johnston Mine here, about half an  hour outside Casper, you&#8217;d never know that over the course of 42 years, 104  million tons of coal was taken out of the ground.</p>
<p>But now, instead of having a heavy carbon footprint&#8211;and coal certainly  does&#8211;these rolling hills have a green footprint. Today, the site is home to a  158-turbine wind farm that produces 237 megawatts of power, enough electricity  for 66,800 households for a year.</p>
<p>And what&#8217;s particularly notable about the site is that while the wind farm is  among the newest and most state-of-the-art in the country today, it is also  likely the first full-scale wind power project to be installed on the site of a  former coal mine.</p>
<p>From 1958 until 2000, the Dave Johnston Mine stretched for 9 miles through  this otherwise barren landscape. But in the late 1990s, after the mine&#8217;s  operator, Rocky Mountain Power, determined that it was no longer economical to  run it, a full-scale reclamation project began.</p>
<p><img title="From coal mine to wind farm" src="http://www.ahjlkj.cn/wp-content/uploads/2009/07/in_the_trees_1_610x405-300x199.jpg" alt="From coal mine to wind farm" /></p>
<h3  class="related_post_title">Related Articals</h3><ul class="related_post"><li>2011年04月15日 -- <a href="http://www.ahjlkj.cn/archives/815" title="He Landa door Shipyard for offshore wind farm">He Landa door Shipyard for offshore wind farm</a></li><li>2011年03月2日 -- <a href="http://www.ahjlkj.cn/archives/774" title="Ningbo will add 4.5 million kilowatts wind farm  for the next year">Ningbo will add 4.5 million kilowatts wind farm  for the next year</a></li><li>2011年02月14日 -- <a href="http://www.ahjlkj.cn/archives/754" title="SuSiLan will build wind farm in wales state  ">SuSiLan will build wind farm in wales state  </a></li><li>2011年01月9日 -- <a href="http://www.ahjlkj.cn/archives/713" title="Heilongjiang province will be built 10 million kilowatts wind farm">Heilongjiang province will be built 10 million kilowatts wind farm</a></li><li>2010年11月22日 -- <a href="http://www.ahjlkj.cn/archives/652" title="The first 93 Earth Wind Farm turbines and power generation">The first 93 Earth Wind Farm turbines and power generation</a></li><li>2010年05月8日 -- <a href="http://www.ahjlkj.cn/archives/433" title="America&#8217;s first offshore wind farm approved">America&#8217;s first offshore wind farm approved</a></li><li>2009年06月18日 -- <a href="http://www.ahjlkj.cn/archives/116" title="Wind farm proposed for Cape military reservation">Wind farm proposed for Cape military reservation</a></li></ul>]]></content:encoded>
			<wfw:commentRss>http://www.ahjlkj.cn/archives/146/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Wind farm proposed for Cape military reservation</title>
		<link>http://www.ahjlkj.cn/archives/116</link>
		<comments>http://www.ahjlkj.cn/archives/116#comments</comments>
		<pubDate>Thu, 18 Jun 2009 15:19:50 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Wind Power News]]></category>
		<category><![CDATA[Wind farm]]></category>

		<guid isPermaLink="false">http://www.ahjlkj.cn/?p=116</guid>
		<description><![CDATA[The Massachusetts National Guard today announced a proposal to build a wind farm on the Massachusetts Military Reservation that would include up to 17 turbines and vastly increase the amount of electricity generated by wind power in the state.
As the first of many steps toward building the project at the 22,000-acre facility on Cape Cod, [...]]]></description>
			<content:encoded><![CDATA[<p>The Massachusetts National Guard today announced a proposal to build a wind farm on the Massachusetts Military Reservation that would include up to 17 turbines and vastly increase the amount of electricity generated by wind power in the state.</p>
<p>As the first of many steps toward building the project at the 22,000-acre facility on Cape Cod, the National Guard has filed a site plan for review with the Federal Aviation Administration and the Air Force Space Command.</p>
<p>Depending on the size, number, and capacity of the turbines, the project could produce up to 34 megawatts of power, boosting Governor Deval Patrick&#8217;s goal to develop 2,000 megawatts of wind power in Massachusetts by 2020. Currently, 11 wind turbines across the state have a total capacity of 6.8 megawatts, according to Robert Keough, spokesman for the state&#8217;s Executive Office of Energy and Environmental Affairs.</p>
<p>The plan has won the support of numerous elected officials, including Patrick, Senate President Therese Murray, and US Representative William Delahunt.<br />
&#8220;Putting wind turbines at MMR makes sense both economically and environmentally,&#8221; said Murray.</p>
<p>The plan has also received the support of community activists who have vehemently protested the Cape Wind project, a controversial proposal to build 130 wind turbines in Nantucket Sound. &#8220;It&#8217;s something we&#8217;ve been saying all along, that you can say yes to wind, but no to Cape Wind,&#8221; said Audra Parker, executive director of the Alliance to Protect Nantucket Sound.</p>
<p>Mark Rodgers, a Cape Wind spokesman, said the project had considered the reservation as a potential site but eventually rejected it. &#8220;We determined placing the same kind of wind farm there as we&#8217;re looking to do offshore could probably produce half as much energy,&#8221; he said. &#8220;That said, there certainly is good potential to do wind development at that site.&#8221;</p>
<p>Before projects go forward, the FAA reviews them to determine if they pose a hazard to aviation, said Jim Peters, New England spokesman for the FAA. Wind turbines, for example, can interfere with air traffic radar signals (a problem that has been raised with the Cape Wind project). If it is determined that the project is a hazard, the FAA will provide a list of ways to mitigate the hazard in order to move forward, Peters said.</p>
<h3  class="related_post_title">Related Articals</h3><ul class="related_post"><li>2011年04月15日 -- <a href="http://www.ahjlkj.cn/archives/815" title="He Landa door Shipyard for offshore wind farm">He Landa door Shipyard for offshore wind farm</a></li><li>2011年03月2日 -- <a href="http://www.ahjlkj.cn/archives/774" title="Ningbo will add 4.5 million kilowatts wind farm  for the next year">Ningbo will add 4.5 million kilowatts wind farm  for the next year</a></li><li>2011年02月14日 -- <a href="http://www.ahjlkj.cn/archives/754" title="SuSiLan will build wind farm in wales state  ">SuSiLan will build wind farm in wales state  </a></li><li>2011年01月9日 -- <a href="http://www.ahjlkj.cn/archives/713" title="Heilongjiang province will be built 10 million kilowatts wind farm">Heilongjiang province will be built 10 million kilowatts wind farm</a></li><li>2010年11月22日 -- <a href="http://www.ahjlkj.cn/archives/652" title="The first 93 Earth Wind Farm turbines and power generation">The first 93 Earth Wind Farm turbines and power generation</a></li><li>2010年05月8日 -- <a href="http://www.ahjlkj.cn/archives/433" title="America&#8217;s first offshore wind farm approved">America&#8217;s first offshore wind farm approved</a></li><li>2009年07月24日 -- <a href="http://www.ahjlkj.cn/archives/146" title="From coal mine to wind farm">From coal mine to wind farm</a></li></ul>]]></content:encoded>
			<wfw:commentRss>http://www.ahjlkj.cn/archives/116/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

