Wind turbines installed office roof
Under construction in the Jingan “gold star” business in Hong Kong, will be the first use of wind power generator in a Class A office buildings – 1788 International Centre, it is learned, 1788 International Center uses a combination of the world’s leading energy saving technology, are the first buildings in Puxi through the global common certification of the first LEED Gold office. Put into use in March 2010 after will be the “gold star” green “landmark.”
1788 International Center of “window wall” to replace the glass curtain wall, double glazed windows recessed in the aluminum window frames inside, and each window can open 70 degrees maximum, this design can save about 30% of the building air-conditioning energy. Group of rooftop wind turbines with 6, it generates the supply of building wind energy lighting used in public channels, each light that one can save 2 million yuan electricity. Building a capacity of 200 tons will be set up in the water tank to collect rain water, the small wind turbines central air-conditioning cooling tower condensing water for irrigation, building cleaning and cleaning floors of the toilet tank water washed it for Building a saving of 12 %.
Related Articals
评论关闭
