Why frequently criticized wind power industry
In recent years, rapid development of wind power industry, however, we also see a phenomenon: the larger the wind power industry, questioned and criticized the sound seems larger. Wind farm is the image of the project, most fans in the “sun”, wind power, “crazy,” excess capacity of wind power, wind power is a waste electricity and so unstable.
Why is there such a criticism? Investigation by the reporter learned that the reason varies.
For wind power, “crazy”, wind generators is a waste of electricity questioned There are two main reasons. First, any energy has its advantages and disadvantages, although wind power is a renewable clean energy, but also has its own intermittent, random defects, its regulation is relatively difficult to control a large number of naturally prone to criticism; second, the wind the development of electricity touched the interests of certain interest groups, must find the wind to attack a number of weaknesses.
The excess capacity of wind power, windmill generators company China Rui Chen Hui that the party needs to clarify some basic concepts, the existence of which Misunderstanding and bias. He told reporters: “Wind power has never surplus, excess wind power equipment companies are blindly repeated introduction of backward technology, which emerged a large number of lower-end product production capacity. This phenomenon is the development of wind power equipment industry, a necessary stage of the process, Only after the policy out of control and market competition, the only form of wind power equipment industry health. “visible, wind power and wind power equipment needs to distinguish between the concepts.
The wind farm is the image of engineering, fan, “sun” of the problem, not the wind farm owners or local governments 12 can be alone, which involves the interests of all parties and the overall planning.
China Guangdong Nuclear Wind Power Co., Ltd Technology Management Ya-Nan Wang told reporters: “SASAC of the state-owned enterprises is very strict assessment criteria, does not allow a loss, the wind power industry-funded enterprises will be unified in accordance with the project evaluation wind turbines method of investment for each project gains, losses do not give the project bank loans, it is not possible to have a business to allow their projects to become the image of engineering, there will not be laissez-faire business devices do not operate their own fans. ”
In addition, the “sun” phenomenon, mainly in the relatively abundant in the electricity supply situation, increase the wind power network will inevitably result in the reduction of other energy generation, wind power under a conflict of interest inevitably been criticized.
Every new thing is not to grow flat, to question this is normal, there is controversy is a good sign, indicating we are very concerned about the growing wind power industry this is good only route. Everyone acknowledged that wind power has just started, there are a lot of them will inevitably need to improve and enhance the place.
However, the wind power industry accused the starting point should be well-meant and constructive, for the uninformed, did not conduct in-depth investigation of the accusations, can deepen understanding and clarification. The kind of criticism for the interests of the Group may be consciously or unconsciously lookout destroyed electrical tree seedlings.
Consistent with the laws of nature, consistent with the historical trend, the interest of humanity not be hard to kill wind power, the wind power industry is just like a lot of new things, in the twists and turns towards the light.
Related Articals
评论关闭
