China’s wind power industry faces opportunities and challenges
For a long time, China’s power supply to rely mainly on thermal power. In 2002, China put forward the strategic adjustment of energy structure, and actively promote nuclear power, wind generators and other clean energy supply, to change the over-reliance on coal energy situation. After several years of wind power, wind power equipment market, accelerating the pace of development, especially into the “Eleventh Five-Year” period, China’s wind power generation industry maintained a rapid development. China 2007 new wind power installed capacity of 3.499 million kilowatts, up 156% growth in 2006, with a total installed capacity of 6.05 million kilowatts, ranking fifth in the world. In 2008, China’s new wind power capacity has reached 6.246 million kilowatts, ranking the world’s second; wind power capacity reached 12.296 million kilowatts, becoming the world’s fourth wind power market.
The financial crisis, the new energy industry is giving birth to a new economic growth point, the world hope through the development of new energy industries, and lead their own out of the economic downturn. In recent years, our government’s support for new energy development, incentives continue to strengthen energy, wind energy as the most commercial potential of new energy sources and highly sought after local governments and the power giant.
Long Yuan Electric Power Group, headed by the current to the wind power generation companies are actively expanding wind power business, raise skill levels and strive for a wind power construction in the new wave of a place. Particular, wind power in 2003, the national implementation of the project concession bidding policy, wind power enterprises to invest in great enthusiasm, since 2005 China’s wind power installed capacity to double year after year, that is, the joint promotion of the wind power business results.
Is expected in 2009, China’s wind power installed capacity will be added to maintain the growth rate of more than 60%, when new wind power in the global proportion of the total installed capacity will increase to 30%. At the current pace of development, China will soon overtake Spain and Germany, in 2012 wind turbines installed capacity is expected to reach 30 million kilowatts, the second largest in the world. However, we must see that China’s wind turbines industry, with foreign wind power still lags behind the developed countries, at present in European countries, the proportion of wind power installed capacity will reach 10% to 20%, or even up to 30%, China to reach the this standard, there is a long way to go.
In the future development of wind power in China will face two difficult places: First, the core technology and equipment, first grid construction.
Related Articals
评论关闭
